![Wolf FGB Series Installation And Maintenance Instructions For Contractors Download Page 23](http://html.mh-extra.com/html/wolf/fgb-series/fgb-series_installation-and-maintenance-instructions-for-contractors_991759023.webp)
3064458_201811
23
14. Electrical connection
Opening the control unit
Opening the control unit back
Push the retaining bracket on the casing upwards and pivot the control unit forwards.
Open the control unit cover using a screwdriver.
Only open the cable entries required.
Insert cable with cable gland and secure.
Otherwise room sealed operation is not ensured.
M12 M12 M12 M16 M16
Please
note
Cable glands