
Operating manual
Page 20 of 32
B0825
GMV-C
6. Transport, installation, start-up and putting out of operation
6.1 Transport
Transport the unit cautiously to its destination. For that purpose, make use of proper
equipment.
6.2 Unpacking
Lift the unit carefully from the packaging and place the unit on a stable as well as plane
support.
Note!
Consider that inside the unit and attached components according to
the bill of delivery there might be residues of blue-coloured test oil.
6.3 Installation
The unit is prepared for being mounted on wall by means of two screws M6. The mounting
area has to be that stable to absorb the weight of the unit including the filled cartridge.
In
addition, make sure that the mounting surface is vertical and plane.
Drilling pattern for wall mounting:
Fixing for screws M8 or
wall mounting screws M6