Assembly
22
PNG.V.138
Fastening in the installation space with 6 M8 screws.
The assembly module can be positioned by means of two different
centering diameters of the installation space:
Ø 138 H6
in the upper range
Ø 110 H6
in the lower range depending on the installation type
The exact position orientation is done with a fitting screw with a
diameter of Ø 9 f7 x 5 mm.
Precise alignment and positioning of the quick-change pallet
system requires that the fitting bore Ø 9 H7 on the opposite side is
precisely positioned in the mounting position.
The air connection is normally made via the coupling
holes in the floor of the unit.
Alternative connection possibility: a side G1/8" connection, which is
free when using the bottom centering diameter 110H6. In this case,
the bottom opening must be sealed. Either by inserting the O-ring
Ø 9 x 1.5 and applying to a flat version or with a sealing plug.
4.3.2
Summary of Contents for 80 809 070
Page 1: ...Original Betriebsanleitung WNT Nullpunktspannsystem PNG PNG SST Montage und Betriebsanleitung...
Page 29: ...Montage 29 PNG SST 6...
Page 40: ...Zusammenbauzeichnungen 40 Zusammenbauzeichnungen PNG 138 PNG T 138 9 9 1...
Page 41: ...Zusammenbauzeichnungen 41 PNG V 138 9 2...
Page 71: ...Assembly 29 PNG SST 6...
Page 82: ...Assembly Drawings 40 Assembly Drawings PNG 138 PNG T 138 9 9 1...