50100935001_SKS-575(Ver2)Rev.02112012E
An overview of the unit
7
3. An overview of the unit
3.1 Layout
drawing
Base configuration
1
6
7
2
3
4
5
1
Searchlight head SKS 575
2
Ballast unit PSUH SKS 575
3
ON/OFF switch and indicator lamp for searchlight
4
Searchlight bas turning unit
5
Pressure connection for atmospheric pressure with flexible tube (5m)
6
Lamp change mechanism
7
Hand wheel for adjusting the reflector
Pressure connection open
Pressure connection closed
Pressure connection!
Make sure that the ball valve is in the open (flow)
position and that the pressure hose is routed properly, so that the casing cannot
build up any overpressure or vacuum.
Summary of Contents for SKS 575
Page 1: ...OPERATING INSTRUCTIONS SUEZ CANAL SEARCHLIGHT SKS 575 230 V 50 60 Hz ...
Page 11: ...50100935001_SKS 575 Ver2 Rev 02112012E An overview of the unit 11 Circuit diagram ...
Page 21: ...50100935001_SKS 575 Ver2 Rev 02112012E Type Approval 21 10 Type Approval ...
Page 22: ...50100935001_SKS 575 Ver2 Rev 02112012E Type Approval 22 ...
Page 23: ...50100935001_SKS 575 Ver2 Rev 02112012E Type Approval 23 ...