50100935001_SKS-575(Ver2)Rev.02112012E
Operation
15
Pressure connection!
Make sure that the ball valve is in the open (flow)
position and that the pressure hose is routed properly, so that the casing cannot
build up any overpressure or vacuum.
Before switching on the searchlight: make sure that all work on the searchlight has been
completed and refer to chapter
4.2
Mounting.
1.
Turn on the main switch (1) on the PSUH ballast unit. The indicator LED (3)
lights up and the lamp is ignited.
2.
If the lamp does not ignite or only flashes a few times, either the operating
voltage is too low or the lamp is defective.
In order to exchange the lamp, refer to chapter
5.4
Changing the lamp (without
opening the casing)
or chapter
7.3 Replacement of defective parts.
5.3 Searchlight head SKS 575
6
7
5
5
Pressure connection for atmospheric pressure
6
Lamp change mechanism
7
Hand wheel for adjusting the reflector
5.4 Adjustment of the reflector
Risk of getting burned!
Never touch the searchlight during operation without
protection. The casing can reach 120 °C. In case of burns cool the injured area
immediately and seek medical help.
Risk of glare!
Never look into the arc during operation. This is dangerous for the
eyes. Never point the searchlight directly at anyone. Before switching on make
sure that nobody is near the searchlight.
The reflector can be adjusted with the aid of the hand wheel (7) on the rear of the
searchlight head. To do this, turn the hand wheel (7) until the desired angle is achieved.
Summary of Contents for SKS 575
Page 1: ...OPERATING INSTRUCTIONS SUEZ CANAL SEARCHLIGHT SKS 575 230 V 50 60 Hz ...
Page 11: ...50100935001_SKS 575 Ver2 Rev 02112012E An overview of the unit 11 Circuit diagram ...
Page 21: ...50100935001_SKS 575 Ver2 Rev 02112012E Type Approval 21 10 Type Approval ...
Page 22: ...50100935001_SKS 575 Ver2 Rev 02112012E Type Approval 22 ...
Page 23: ...50100935001_SKS 575 Ver2 Rev 02112012E Type Approval 23 ...