APPENDIX 1: INSTALLATION INSTRUCTIONS
Background
I. Introduction
1
II. Equipment
Requirements
1
III. Uplink Connection Options
3
Setup
IV.
Step
1:
Install
the
S-Box
4
V.
Step 2: Connect the Computer(s)
4
VI.
Step 3: Connect the Uplink Device(s)
6
VII.
Step
4:
Connect
the
TVRO
7
VIII.
Step
5:
Installation
Optimisation
8
IX.
Step
6:
Configure
all
Uplinks
9
Configuration Changes
X.
Adding and Editing Uplinks
10
XI.
Changing the Uplink Transport Protocol
12