SERVICE MANUAL & ICA
WIPLINE 13000 FLOATS
Page 28
Revision H
P/N 1002548
13. Install the O-ring onto the fill/drain plug before installing the plug onto the end-cap and tighten.
14. Install the O-ring onto the Schrader valve and install onto the outside of the end-cap.
NOTE: Align Schrader valve 180 degrees from the Placard.
NOTE: Double check the plugs and bolts for proper installation and security before adding gas charge.
15. Fill the strut with nitrogen to 250 psi +/- 10 psi and close the valve and cap.