2E1 to 2Eth Converter
17
marked.
Such marks as
“
note
”
,
“
warning
”
in operation manual are specially remarked on
how to operate safely and correctly, which should be observed strictly.
Packing and appearance checking
1)
After you receive devices, firstly you should check whether the packing is
damaged, if it is, please contact with our after-service department immediately
so as to solve the problem in time.
2)
Please check according to the loading list with the box open. If there is
damage on the outside of rack, please contact with installation person or
after-service department directly so as to exchange.
Installation
1
)
Fasten the equipment in the rack-Mounted.
2
)
Input the power, If it is DC input, First measure its voltage value and its polarity
with multi meter, our device will self- detect automatically while you can detect
whether the indication lights work normally.
3
)
Sending signal and receiving signal over E1 interface should corresponding.
Equipment Maintenance
1) Before leaving the factory, the equipments have been adjusted at their best. And
all the functional interfaces are located in the front and rear panel. So do not open
the equipment by yourself without our technicians.
2) When the equipment encountered with troubles, you can check the trouble area
range by single self-loop function and contact with our company in time.