3
Rotary or alternating current?
The machine can be connected both to rotary and alternating current. If
the machine is put to another location, the design of rotary or alternating
current can be changed anytime.
On site (at the customer’s site) the following operations must be carried
out:
1. Switching the boiler heating element
(
page 3)
2. Install and connect the appropriate mains connection cable
(
page 4)
3. Connection to the supply and return system on site (water,
wastewater, current); according to the operating instructions
4. Adjust parameter P555 (locking device)
(
page 4)
Switching the boiler heating element
The performance of the boiler heating
element is determined by the switching of
bridges.
The switching of the bridges must match
the electrical supply and the fusing.
The bridges are located in the plinth of
the machine.
Please see the connection scheme on
the back of the stiffener wall to the
electric installation compartment how the
bridges must be switched.
Summary of Contents for UC-L
Page 1: ...Winterhalter Undercounter Dishwashers UC Series Repair manual ...
Page 10: ...8 Exchange collector ...
Page 12: ...10 Exchange collector continuation ...
Page 14: ...12 Exchange collector continuation ...
Page 16: ...14 Exchange boiler heating element ...
Page 18: ...16 Exchange boiler ...
Page 22: ...20 Exchange tank heating element ...
Page 24: ...22 Exchange pump head dosing device Fluidos ...
Page 26: ...24 Exchange dosing device Fluidos ...
Page 28: ...26 Exchange integrated water softener ...
Page 30: ...28 Exchange integrated water softener continuation ...
Page 32: ...30 Exchange heat exchanger radial fan ...
Page 34: ...32 Exchange heat exchanger radial fan continuation ...
Page 46: ...44 ...
Page 47: ......