29
Procedures (continuation)
Unscrew the terminal block and grounding cable
De-install right flute of the strike plate
Sideways, unscrew the boiler with the terminal block out of the
machine
Open the machine door
Remove lower rotating wash field
Unscrew the fastening nut of the water softener
Pull off all cables and hoses at the water softener
Take the water softener out of the machine
Installation of the new water softener
The installation is carried out in reverse order. At the same time use a
new o-ring seal.
After the assembly:
Carry out a function test
Ventilate the dosing devices
Carry out a safety test according to VDE 0701
Summary of Contents for UC-L
Page 1: ...Winterhalter Undercounter Dishwashers UC Series Repair manual ...
Page 10: ...8 Exchange collector ...
Page 12: ...10 Exchange collector continuation ...
Page 14: ...12 Exchange collector continuation ...
Page 16: ...14 Exchange boiler heating element ...
Page 18: ...16 Exchange boiler ...
Page 22: ...20 Exchange tank heating element ...
Page 24: ...22 Exchange pump head dosing device Fluidos ...
Page 26: ...24 Exchange dosing device Fluidos ...
Page 28: ...26 Exchange integrated water softener ...
Page 30: ...28 Exchange integrated water softener continuation ...
Page 32: ...30 Exchange heat exchanger radial fan ...
Page 34: ...32 Exchange heat exchanger radial fan continuation ...
Page 46: ...44 ...
Page 47: ......