STANDARD
OPERATION
PROCEDURE
(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B
16
Part No
98TF07MA4001
Revision
100
S
tation
Operation Name
LTE
Antenna
Assembly
Remark
Items Material:
A
39700030001A
B
39700030001B
C
88070T164211
D
9117070K8001
Steps Assembly Description:
1
The LTE Main antenna (A) containing
copper foil and conductive foam sticker
must attached onto the back Cover then
follow illustrated antenna cable alignment
and secured with insulating tape.
2
The LTE AUX antenna(B) must follow
according to the diagram attached to BR
Cover(C)
3
Use adhesive to fix onto Cover (D) the
LTE AUX w/o antenna BR must attach to
the back cover and fix the alignment.
Items Tools:
1
Tape
Items Note:
1
STEP 1
A
STEP 2
B
C
STEP 3
D