![Winmate M700DM4 Standard Operation Procedure Download Page 14](http://html1.mh-extra.com/html/winmate/m700dm4/m700dm4_standard-operation-procedure_987191014.webp)
STANDARD
OPERATION
PROCEDURE
(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B
14
Part No
98TF07MA4001
Revision
100
S
tation
Operation Name
IO
Board
Assembly
(
二
)
Remark
Items Material:
A
397000000005
B
9B000000000H
C
9B000000000S
Steps Assembly Description:
1
Affixed the conductive sponge to
GPS ,then the wifi antenna must connect to
CPU Board, follow antenna alignment as
shown in the figure (marked in red)
2
The Camera(B)Across LED Board(C)must
installed to IO Board
3
The GPS antenna (A) must connected to
CPU Board then fix antenna location,
follow GPS antenna alignment as shown in
the figure.
item Tools:
1
Insulating tape
Item Note:
1
GPS antenna required along the CPU
Board perimeter routing, not above CPU
Board, do not press on top of the CPU steel
when closing the back cover to prevent
over pressure.
2
The GPS antenna position must
approximately between the 2 screw hole in
the middle position.
STEP 1
STEP 3
A
STEP 2
B
C