RP100XD
OPERATIONAL AND SAFETY
REQUIREMENTS
PRE-DELIVERY
1.1
Drive coupling alignments, pan and star meshing of pan rack and drive gear.
1.2
Operating clearances star blade to pan. Fixed blade to pan wall.
1.3
Correct oil level in gearboxes. All grease points charged. Gear teeth greased.
1.4
No load test. Correct rotations.
PRE INSTALLATION
2.1
Check consignment.
2.2
Offload equipment using certified lifting gear of suitable capacity, by a competent
person (see separate chart for nett weight).
INSTALLATION
3.1
Refer to contract arrangement and site instructions.
3.2
Mixer to be mounted on supports of adequate strength and rigidity to prevent undue
vibration when mixing and securely bolted.
3.3
Mixer frame to be level on structure, add packers as required.
3.4
Check that pan is correctly seated and that pan rack and drive gear are in correct
mesh.
ELECTRICAL SERVICES
4.1
Refer to wiring diagram in Ops Manual. All wiring to be undertaken by competant
electrician, it is recommended that the mains electrical supply is provided via an earth
leakage circuit breaker.
NOTE:
electrical cables particularly those with copper
conductors suffer from a condition known as ‘relaxation’ which may cause wiring to
work loose over a period of time, it is recommended that the tightness of wiring
connections and terminals are checked following the first month in service.
Summary of Contents for Croker CUMFLOW RP100XD
Page 4: ...OPERATING AND MAINTENANCE MANUAL SECTION 1 GENERAL INFORMATION RP100XD...
Page 11: ...INSTALLATION DRAWING...
Page 12: ...OPERATING AND MAINTENANCE MANUAL SECTION 2 INSTALLATION AND OPERATING INSTRUCTIONS...
Page 19: ...OPERATING AND MAINTENANCE MANUAL SECTION 3 TECHNICAL SPECIFICATION AND MAINTENANCE...
Page 25: ...LUBRICATION CHART...
Page 26: ...OPERATING AND MAINTENANCE MANUAL SECTION 4 MIXER SPARE PARTS...
Page 27: ...RP100XD MIXING PAN DRIVE...
Page 30: ...RP100XD STAR DRIVE ASSEMBLY...
Page 32: ...RP100XD MIXING STAR ASSEMBLY...
Page 34: ...RP100XD MIXING STAR LIFTING ARRANGEMENT...
Page 36: ...RP100XD COVERS GUARDS...
Page 44: ...OPERATING AND MAINTENANCE MANUAL SECTION 5 ANCILLARY EQUIPMENT SPARE PARTS...
Page 45: ...RP100XD PAN TROLLEY...
Page 47: ...PAGE INTENTIONALLY BLANK...
Page 50: ...OPERATING AND MAINTENANCE MANUAL SECTION 6 ELECTRICAL SYSTEM...
Page 51: ...CONTROL BOX WIRING LAYOUT...
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ...OPERATING AND MAINTENANCE MANUAL SECTION 7 MISCELLANEOUS...