
To Order Parts Call 1-888-702-5326 - https://monsterfloorequipmentparts.com
MAINTENANCE
86039020 VOYAGER E 08/20/07
4-5
SERVICE SCHEDULE
MAINTENANCE DAILY
WEEKLY
QUARTERLY
Check machine for cord damage
*
Check recovery dome and gasket for damage and
cleanliness
*
Check brush – should be clean with no lint or
strings attached
*
Inspect vac shoe for blockage; remove fibers with
coat hanger, etc.
*
Check hoses for wear, blockages, or damage
*
Check handles, switches, and knobs for damage
*
Check vac motor intake filter and clean
*
Run one gallon of water through system
*
Clean out recovery tank and check float valve to
make sure it moves freely
*
Clean out solution tank and remove and clean
vacuum intake screen
*
Clean outside of all tanks and check for damage
*
Run vac motor for at least one minute to allow
motor to dry
*
Store with dome off tank to allow the tank to dry
*
Check all bearings for noise
*
Check all gaskets for wear and leakage
*
Check vacuum intake screen for damage; replace
if necessary
*
Check pump pressure; observe spray pattern and
check with gauge if necessary
*
Check and clean solution screen
*
Check belts for wear and replace as necessary
*
Check brush for wear; ensure bristles are not
damaged
*
Check cables for fraying
*
Check the spray bar (manifold) for damage;
replace if broken or bent
*
Check condition of vac shoe and frame for
damage
*
Check overall performance of machine
*
Check vac motor carbon brushes
*