Installation and operating instructions Wilo-Rexa PRO 25

COMMISSIONING 

US English

nections of two windings must be swapped, e.g. U1 

with V1 and U2 with V2.

6.3.  Level control

Check that the level control device is installed 

properly and inspect the switching points. For the 

required information please refer to the installa-

tion and operating instructions for the level control 

device, as well as the planning documentation.

6.4.  Operation in potentially explosive areas

If the pump is marked accordingly, it can be used 

inside potentially explosive areas.

RISK of fatal injury due to explosion!

Pumps without Ex marking must not be used 

in potentially explosive areas! There is a risk of 

fatal injury due to explosion! Check your pump 

before use to verify that it has the relevant ap-

proval:

•  Ex symbol
• 

Ex classification, e.g. II 2G Ex d IIB T4

•  Also note the additional information in the ap-

pendix!

6.5.  Commissioning

The pump must have been installed properly as 

specified in the “Installation” section. This must be 

checked before the system is switched on.

Minor oil leakage at the mechanical seal on delivery 

is no cause for concern. However, it must be re-

moved prior to submersion in the fluid.

Keep people out of the pump's working area. No 

persons should be allowed in the working area 

during startup or operation.

If the pump falls over, it must be switched off be-

fore setting it up again.

WARNING: danger of crushing!
In portable installations, the pump can fall over 

when it is switched on or during operation. 

Make sure that the pump is positioned on a 

firm bearing surface and that the pump foot is 

mounted correctly.

In the version with a plug, note the plug's IP protec-

tion class.

6.5.1.  Before switching on

• 

Check the following, in general:

• Cable guidance – no loops, slightly taut

• 

Min./max. temperature of the fluid

• Max. immersion depth

• Clean the pipe system on the pressure side (hose, 

piping) – flush with clean water to prevent de

-

posits forming clogging.

• 

The hydraulics housing must be completely filled 

by the fluid and there must be no air in the hous

-

ing. It can be vented by suitable venting devices 

in the system or, if available, using vent screws on 

the pressure port.

• Check switching points of level control and dry-

running protection systems

• 

Check to ensure all accessories are properly fitted

• The following points must also be checked in the 

case of wet well installation:

• Clean the pump sump of coarse contaminants

• Open all slide valves on the pressure side

• The following points must also be checked in the 

case of dry well installation:

• 

Clean the piping on the suction side – flush with 

clean water to prevent deposits causing clogging.

• Open all slide valves on the pressure and suction 

sides

If the slide valves on the suction and pressure 

sides are closed during operation, the fluid in the 

hydraulics housing is heated up by the pumping 

movement. This heating creates strong pressure 

in the hydraulics housing. The pressure can result 

in the pump exploding. Before switching on the 

pump, ensure that all the slide valves are open and 

open any closed slide valves.

6.5.2. 

Switching on/off

The pump is switched on and off using a separate 

operating point (on/off switch, switchgear) provided 

by the customer.

During the start-up procedure, the rated current is 

temporarily exceeded. After the start-up procedure 

is finished, the current must not exceed the rated 

current again.

If the motor does not start up, it must be switched 

off without delay. Before switching it on again, 

wait for the specified start pause and make sure to 

rectify the fault.

6.6.  Conduct during operation

When operating the pump, always follow the 

locally applicable laws and regulations for work 

safety, accident prevention, and handling electrical 

machinery. To help ensure safe working practice, 

the responsibilities of employees should be clearly 

specified by the operator. All personnel are respon

-

sible for ensuring that regulations are observed.
Due to their design, centrifugal pumps have rotating 

parts that are easily accessible. Depending on the 

operating conditions, sharp edges can develop on 

these parts.

WARNING: danger of crushing and amputation 

of limbs!
Sharp edges can form on the rotating parts in 

the hydraulics. These can result in crushing and 

amputation of limbs. Never reach into the hy-

draulics when the machine is in operation.

Summary of Contents for Rexa PRO Series

Page 1: ...Pioneering for You Wilo Rexa PRO 6065992 Ed 04 07 2015 WH US Installation and operating instructions fr Notice de montage et de mise en service es Instrucciones de instalaci n y funcionamiento...

Page 2: ...Fig 3 Fig 2 Fig 1 1 5 7 6 3 4 2 1 5 6 6 3 3 4 2 S1 S1 S2 S3 7a 7b 1 1 5 9 6 3 4 2 S1 S1 S2 S3 8 7b 7a d A A min 1 x d A d min 0 3 x d B...

Page 3: ...Fig 5 Fig 6 Fig 4 1 4 8 3 3 6 5 2 7 U1 Z1 3 U2 4 Cr Z2 5 C S M 1 gn ye L N PE 1 2 6 3 4 gn ye 1 2 6 21 20 DK 5 1 2 4 3 M 3 gn ye W V 21 20 U PE 6 DK 5 1 2 4 3 M 3 gn ye W V 11 10 U PE 6 DK...

Page 4: ...M 3 gn ye W V 20 21 U PE 6 22 5 1 2 4 3 M 3 gn ye W V 10 11 U PE 6 12 max C min C Fig 8 5 4 3 W1 V1 U1 5 4 3 W2 V2 U2 1 max C min C 2 M 3 gn ye 20 21 PE 6 22 5 1 2 4 3 M 3 gn ye W1 V1 10 11 U1 5 4 3 W...

Page 5: ...Fig 9 1...

Page 6: ...port and storage 16 4 1 Delivery 16 4 2 Transport 16 4 3 Storage 16 4 4 Return delivery 17 5 Installation 17 5 1 General 17 5 2 Installation methods 18 5 3 Installation 18 5 4 Dry running protection 2...

Page 7: ...reserves the right to make tech nical modifications to units or components This operating and maintenance manual refers to the pump shown on the title page 1 5 Warranty In general the specifications i...

Page 8: ...e directives and regulations Safety information that refers only to material dam age is printed in gray without safety symbols 2 2 General safety When installing or removing the pump never work alone...

Page 9: ...connection may only be made if the switch gear complies with the harmonized EU standards Cellphones and other mobile radio equipment may cause malfunctions in the system WARNING electromagnetic radiat...

Page 10: ...nt general safety and health requirements of the European Union as well as the published European standards and internationally recognized German standards Since this product was not intended to be so...

Page 11: ...als if there is water ingress into the sealing cham ber through the mechanical seal on the fluid side 3 2 4 Seal The seal for the fluid and the motor compart ment is made via two mechanical seals The...

Page 12: ...mersed is not possible with all motors Observe the information on the rating plate Operating mode S3 50 is permissible if the necessary motor cooling is guaranteed by complete immersion for at least 1...

Page 13: ...plug Installation and operating instructions 3 8 Accessories Cable lengths up to 160 ft 50 m in fixed length increments of 40 ft 12 5 m or customized cable lengths on request Guide system Pump foot E...

Page 14: ...act coating fulfills its intended purpose Please note that elastomer parts and coatings be come brittle over time If the product is to be stored for longer than 6 months we recommend checking these pa...

Page 15: ...orresponding protec tion class must be observed In general switchgear is to be installed outside potentially explosive areas in such a way that it is protected from submersion When used in an explosiv...

Page 16: ...nd operating instructions for the guide system 2 Preparing the pump for operation on a guide sys tem about 1 3 h see the installation and operating instructions for the guide system 3 Installing the p...

Page 17: ...pipe system on the suction and pressure sides must be self supporting i e it may not be sup ported by the pump In addition the pump connec tion to the pipe system must be free of stress and vibration...

Page 18: ...qualified electrician ap proved by the local energy supply company in accordance with locally applicable regulations DANGER from incorrect connection With Ex rated pumps the power supply cable must be...

Page 19: ...inding 2 3 L U1 Z1 4 N U2 5 Z2 Connection for start and operating capacitor 6 DK Leakage detection for motor com partment green yellow gn ye PE Ground Connection WITHOUT capacitor switchgear If the un...

Page 20: ...oring When the low threshold is reached a preliminary warning may be issued when the high threshold is reached the motor must switch off When used outside potentially explosive areas the bimetallic st...

Page 21: ...injury when commissioning the pump the following points must be observed Commissioning of the pump may only be carried out by qualified and trained personnel in accordance with the safety instruction...

Page 22: ...an be vented by suitable venting devices in the system or if available using vent screws on the pressure port Check switching points of level control and dry running protection systems Check to ensure...

Page 23: ...at the temperature of the fluid and in the operating space does not fall below 37 F 3 C This ensures that the pump is always ready for op eration For extended downtime a regular monthly to quarterly 5...

Page 24: ...tenance or repair work the pump must be installed and connected as described in the In stallation section The pump must be switched on as described in the Commissioning section Note the following All...

Page 25: ...ng conditions 2 years Visual inspection of the power supply cable Visual inspection of accessories Visual inspection of the coating and housing for wear Functional inspection of all safety and monitor...

Page 26: ...e are relatively large deviations consult the manufacturer 8 3 5 Inspection of the switchgear relays used See the relevant installation and operating instruc tions for a description of the individual...

Page 27: ...free the impeller or clear the suction port 7 The fluid is too dense Consult the manufacturer Fault unit is running but not pumping 1 No fluid available Open inlet for tank or slide valve 2 Inlet bloc...

Page 28: ...ider the flow rate in the pipe The slower the flow rate the greater the risk of solids depositing in the pump and piping We therefore recommend a minimum flow rate of 2 3 ft s 0 7 m s at a pumping pre...

Page 29: ...the Electrical connection section the following points must be observed for Ex rated pumps The power supply cable must be connected outside the potentially explosive area or inside a housing with an...

Page 30: ...lowing points for Ex rated pumps The end user is responsible for defining the poten tially explosive area Only pumps with Ex approval may be used within a potentially explosive area Ex rated pumps mus...

Page 31: ...IL 60018 USA Phone 888 954 6872 Fax 888 945 6783 Manufacturing Facility 86 Genesis Parkway Thomasville Georgia 31792 USA Phone 229 584 0097 Fax 229 584 0234 WILO Canada Inc Bay 7 2915 10th Ave N E Cal...

Reviews: