9.  Maintenance and repair

POTENTIALLY fatal danger due to electrical 

voltage! 

There is a risk of fatal electric shocks oc

-

curring when performing work on the open 

switchgear. During all work, the switchgear 

must be disconnected from the electricity 

network and secured against reactivation 

without permission. All electrical work must 

be carried out by a qualified electrician.

After completing maintenance or repair work, 

the switchgear must be connected according to 

the “Installation” section and activated as under 

"Commissioning".

Maintenance or repair work and/or con-

structional changes that are not listed in this 

operating and maintenance manual may only be 

carried out by the manufacturer or by author-

ised service centres.

9.1.  Maintenance intervals

To ensure reliable operation, various maintenance 

tasks must be carried out regularly.

NOTE 

When used in sewage lifting units inside build-

ings or on land plots, the maintenance intervals 

and work shown in DIN EN 12056‐4 must be 

adhered to.

Before initial commissioning or after a longer 

period of storage:

• Clean the switchgear

Yearly

• Visual inspection of individual components

9.2.  Maintenance work

Prior to maintenance work, the switchgear must 

be switched off as described under "Temporary 

shutdown". Maintenance work may only be car

-

ried out by qualified persons.

9.2.1.  Clean the switchgear

Use a damp cotton cloth to clean the switchgear.

Do not use any aggressive or scouring cleaners 

or fluids!

9.2.2.  Visual inspection of individual components

Have the individual components checked for wear 

by a qualified electrician or Wilo Customer Service 

(e.g. melting of protective contacts, deformation 

of plastic parts).

If severe wear is identified, have the affected 

components replaced by a specialist electrician or 

Wilo Customer Service.

9.3.  Repair work

Prior to repair work, the switchgear must be 

switched off as described under "Final shutdown" 

and all power supply cables dismantled. Repair 

work must be carried out by an authorised service 

centre or Wilo Customer Service.

10. Troubleshooting and possible solutions

DANGER due to electrical voltage! 

Improper procedures during electrical work 

may result in fatal injuries caused by electrical 

voltage! Such work may only be carried out by 

a qualified electrician.

Potential faults are indicated visually and audibly. 

According to the fault shown, the connected 

pump or signal transmitter must be checked for 

correct operation and replaced if necessary.

Only perform this work if suitably qualified 

personnel are available. Electrical work must be 

carried out by qualified electricians for instance.

We recommend always having this work carried 

out by Wilo Customer Service.

Unsanctioned modifications to the switchgear are 

made at the operator's own risk and release the 

manufacturer from any warranty obligations.

10.1. Acknowledging faults

After a fault occurs, a visual and audible warning is 

output.

By briefly pressing the Buzzer OFF/reset button, 

the audible alarm is deactivated and collective fault 

signal relay (SSM) acknowledged.

When held down for longer (min. 1 sec), the fault is 

acknowledged and the control is reenabled.

A fault can only acknowledged once it has been 

eliminated!

10.2. Fault signals

LED lights up yellow

Cause: The set service interval has expired

Solution: Perform maintenance on the unit and have 

the counter reset by Wilo Customer Service

LED flashes yellow

Cause: The monitored operating parameters have 

been exceeded

Solution: Check the settings on the unit and have 

the counter reset by Wilo Customer Service

LED lights up red

Cause:

 permitted rated current has been exceeded, 

excess current release has been initiated

Solution:

 Check pump and setting of DIP switch 1

LED flashes red

Cause:

 Rated current below 300 mA during opera

-

tion or phase L2 missing

Solution:

 Check mains connection of switchgear 

and pump connection

Summary of Contents for Control MS-L 2x4kW Series

Page 1: ...e manutenzione pt Manual de Instala o e funcionamento nl Inbouw en bedieningsvoorschriften da Monterings og driftsvejledning sv Monterings och sk tselanvisning fi Asennus ja k ytt ohje el hr Upute za...

Page 2: ...Fig 1 1 2 3...

Page 3: ...SSM Alarm GL WSK P2 WSK P1 SL 10 16 15 14 13 12 11 9 8 7 6 5 4 3 2 1 HW T1 1 3 5 13 A1 2 4 6 14 A2 T2 T3 L1 L2 L3 NO L1 L2 L3 N WSK M 3 WSK M 1 T1 1 3 5 13 A1 2 4 6 14 A2 T2 T3 L1 L2 L3 NO ON DIP 1 2...

Page 4: ...50Hz U brown yellow green pink grey brown black grey blue V W white P1 P2 ON OFF ON NW 16 black brown black grey blue brown 30 15 0 Seconds ON 100 K DIP 1 2 3 4 5 6 7 SSM Alarm GL WSK P2 WSK P1 SL 10...

Page 5: ...N 100 K DIP 1 2 3 4 5 6 7 SSM Alarm GL WSK P2 WSK P1 SL 10 16 15 14 13 12 11 9 8 7 6 5 4 3 2 1 HW T1 1 3 5 13 A1 2 4 6 14 A2 T2 T3 L1 L2 L3 NO L1 L2 L3 N WSK M 3 WSK M 1 T1 1 3 5 13 A1 2 4 6 14 A2 T2...

Page 6: ...ry 32 5 Installation 32 5 1 General 32 5 2 Types of installation 32 5 3 Installation 32 5 4 Electrical connection 33 6 Operation and function 36 6 1 Controls 36 6 2 Button lock 37 7 Commissioning 37 7...

Page 7: ...refers to the switchgear indicated on the title page 1 5 Warranty In general the specifications in the current gen eral terms and conditions apply for the warranty You can find these here www wilo co...

Page 8: ...les and or insulation the switchgear must be shut down immediately by the operator Tools and other objects should be kept in their designated places so that they can be found quickly The switchgear ma...

Page 9: ...with buttons 2 LED indicators The switchgear comprises the following main components Main switch for switching the switchgear on off NOTE The S version has no main switch A plug is pre assembled inste...

Page 10: ...ns connection Installation and operating instructions Variant S Switchgear with connected cable and plug 1 230 V Shockproof plug 3 400 V CEE phase inverter plug with phase inverter Installation and op...

Page 11: ...must be clean dry and free of vibrations Avoid exposing the switchgear to direct sunlight The customer must provide the power supply cables These must be of sufficient length so that connection to the...

Page 12: ...by an electrician authorised by the local energy supply company Observe the installation and operating in structions for the connected pump and signal transmitters The mains connection current and vo...

Page 13: ...ct ed to the earth terminal NOTE With the S version the pump is connected at terminals 2 T1 L 4 T2 N Pump connection 3 400 V Terminals 2 T1 U 4 T2 V 6 T3 W The protective ground conductor PE is con ne...

Page 14: ...inals 11 12 and 13 of the termi nal strip DANGER due to electrical voltage An external voltage is applied at the terminals for this function This is also present at the terminals when the main switch...

Page 15: ...ill be emitted independent of the electricity network on power failure An audible constant tone will be emitted as an alarm 1 Place the rechargeable battery in the holder Pay attention to the correct...

Page 16: ...fault signal relay deactivated during an alarm signal with the Buzzer OFF Reset button Faults cannot be acknowledged nor can the control be released 7 Commissioning POTENTIALLY fatal danger due to ele...

Page 17: ...direction of rotation and set Observe the wire designations on the wiring diagram when connecting the switchgear and the connected pumps 7 4 1 Checking the direction of rotation The rotation control o...

Page 18: ...rdingly Ambient operating temperature 30 60 C Air humidity 40 50 Prevent formation of condensate BEWARE of moisture Ingress of moisture will result in damage to the switchgear During standstill time p...

Page 19: ...ectrician or Wilo Customer Service 9 3 Repair work Prior to repair work the switchgear must be switched off as described under Final shutdown and all power supply cables dismantled Repair work must be...

Page 20: ...ooting If the points listed here do not rectify the fault contact Wilo Customer Service They can help you as follows Telephone and or written support from Wilo Customer Service On site support from Wi...

Page 21: ...ung folgenden einschl gigen Bestimmungen entspricht in its delivered state complies with the following relevant provisions est conforme aux dispositions suivants dont il rel ve Niederspannungsrichtlin...

Page 22: ...Pioneering for You WILO SE Nortkirchenstra e 100 44263 Dortmund Germany T 49 0 231 4102 0 F 49 0 231 4102 7363 wilo wilo com www wilo com...

Reviews: