WILMS 1221135 Operating Manual Download Page 8

- 5 of 14 -

 
1.

Starting

Only well instructed persons should start and work with the heater.

Before starting the heater check for obvious defaults, proper setting up and as well the 
electr. supply.

a)

Ensure a stable set up of the heater.

b) 

Fill the tank with clean Heizöl EL (Diesel).

c)

Install exhaust system according to the drawing, see page 10.

d)

Power supply: Connect heater to the 230 V - 50 Hz power supply.

e) 

Put room thermostat on suitable place in the room and set to desired

           temperature. (Must be above ambient temperature).

A T T E N T I O N

The heater is standard equipped with a fuel preheating device. The function of the 
preheating is only given if the heater remains on stand-by with plugged-in electrical
plug for appr. 15-20 min. before the first starting.
During this time the oil is preheated so that the sorting out of paraffine is avoided.
During service always obbey the surface temperature from the fuel preheating device. 
Disconnect the heater first from the power supply and let it cool down (danger of 
burning).

Operation "Heating without room thermostat"

Set main switch to position "1".
The automatic heating operation is started when the switch is set to position "1".
The heaters works continuously, the delivered blind plug must be connected with the 
thermostat socket.

Operation "Heating with room thermostat"

The heater works automatically and depends on the temperature. Remove the blind 
plug, connect the plug of the room thermostat with the thermostat socket. Adjust 
required temperature on the room thermostat, turn again main switch to position "1".
Set room thermostat to desired temperature.

Operation with warm air hose

The device can be operated with a warm air hose (max. length 7.60 m). This is only to 
be used in connection with a hose adapter. It is essential to ensure proper installation;
reducing the diameter can lead to overheating and shutdown of the device (safety 
thermostat)!

Summary of Contents for 1221135

Page 1: ...Perfection is our aim Oil Fired Heaters Operating Manual BV 135...

Page 2: ...current emissions EN 55011 EMC Requirements DIN EN ISO 12100 Safety of machinery EN 60335 Safety of electrical machines DIN EN ISO 13857 Safety of machinery Note The observance of DIN EN ISO 13857 re...

Page 3: ...ng without room thermostat 5 Operation Heating with room thermostat 5 Operation with warm air hose 5 2 Stopping 6 Important 6 3 Safety and control devices 6 Room thermostat 6 4 Cleaning 7 Cleaning of...

Page 4: ...tive Therefore leave the plug into the socket When ordering spare parts please give the type serial number of the heater and the part number otherwise a correct delivery is not possible The admissible...

Page 5: ...ite the atomized fuel The light of the flame activates the photo cell and ignition switches off automatically In case of disturbance or instable burning the flame control switches off the heater The o...

Page 6: ...etc It is essential that there is a sufficient ventilation of the room The heater may not be worked on or transported during operation If the heater is used for drying of grain the set up has to be i...

Page 7: ...ty kW 24 8 kcal h 21 300 Air volume m h 1 500 Pressing max total Pa 100 Max fuel consumption approx kg h 2 09 Heiz l EL or Petrolium Tank capacity Ltr 40 Dimensions L mm 1250 W mm 490 H mm 690 Weight...

Page 8: ...uring service always obbey the surface temperature from the fuel preheating device Disconnect the heater first from the power supply and let it cool down danger of burning Operation Heating without ro...

Page 9: ...utton lights up After the cause of the malfunction has been cleared the reset button can be pushed and the burner can be restarted In case the limit switch has shut off check the malfunction and elimi...

Page 10: ...by removing the drain plug on the bottom of the tank Collect the dirty fuel in an external container Rinse the fuel tank several times with clean fuel no dirt particle should remain in the tank Check...

Page 11: ...tarts shortly and Lack of fuel Check oil level in tank shutts off The red lamp lights up Air bubbles in the Check fuel suction and suction line return line Control lamp push reset button On initial st...

Page 12: ...ons or an installed exhaust pipe as shown in the drawing Never start the heaters connected to just an exhaust pipe which has been lead through the wall Use it only with an additional exhaust pipe mini...

Page 13: ...of the burner head Measure A 4 mm Measure B 2 mm Measure C 0 mm Measure D 9 mm Measure E Between 2 and 3 for approx 12 CO Burner Nozzle Danfoss 0 50 usgal h 80 S Pump Pressure 12 bar Adjustment of th...

Page 14: ...nd NK Thermostat Fan THZ Tank Heating F Photocell RT Socket for thermostat STB Safety Thermostat BA Controler lower part MV Solenoid Valve HR Relays ZT Ingnition Transformer S Switch M Motor C Condens...

Page 15: ...e 01 23 6162479 Nozzle 01 24 6162301 Burner Head 01 25 6162734 Flame Control 01 26 6162417 Bracket 01 27 6162418 Thermostat 01 28 6162419 Bracket 01 29 6162323 Combustion Chamber 01 31 6162422 Lead Th...

Page 16: ...e 01 68 1130046 Clamp Hose 02 70 6162304 Burner Cover 01 71 6161318 Safety Thermostat 01 72 6162306 Ignition Cable 02 73 6162454 Cable with Plug 01 74 6162754 Control Box Socket 01 75 6162486 Grommet...

Page 17: ...14 of 14 BV 135 Exploded view...