Rev. 9/2021
Installation & Operation Manual
AquaFount
®
Washfountain
WAF-4400 Series
Willoughby Industries, Inc.
TOLL FREE
(800) 428-4065
● LOCAL
(317) 875-0830
● FAX
(317) 875-0837
Page 18
www.willoughby-ind.com
Installation Instructions (cont.)
Step 5: Final Assembly
Parts supplied:
• Solid surface cover
• Front panel
• 1/4-20 tinnerman nut
• 1/4-20 x 1" security screws
• 1/4-20 1" flat head security screws.
1.) Make all final plumbing connections to the drain and valve inlets. The washfountain is supplied
with flex hoses (flex hoses have shut-off valves attached that should be connected to the
supply inlets)�
2�) Once all of the connections in the actuator housings are complete, locate the transformer�
NOTE: PLUG-IN TRANSFORMER (IF NEEDED) MUST BE USED WITH A GROUND FAULT
INTERRUPT (GFCI) RECEPTACLE TO HELP PREVENT POSSIBLE ELECTRICAL SHOCK.
3.) Test the system for leaks (both supply and waste).
4�) Place tinnerman nuts on the tabs on the top of the actuator housing�
5.) Secure top cover with flat head security screws onto the mounting tabs.
6.) Set desired temperature with the adjustable mixing valve (see instruction near the back of
this manual)�
7�) Secure front panel by inserting the top panel under the lip of the pedestal and secure with
security screws�