PAGE 22 OF 80
NIGHT SCAN CHIEF
OPERATING INSTRUCTIONS
TP-4602001-T
DECEMBER 2020
Figure 5-1 Night Scan Chief Reaction Loads on Mounting Structure
5.2 Recommended Installation Tools
Table 5-1 lists recommended tools and materials for installation.
5.3 Unpacking & Handling
Unpack and handle the items as follows:
1. Carefully remove all the small cartons from the large crate or carton.
2. Remove all the items from the small cartons.
3. Ensure all components are included and that the required tools are readily available.
4. Inspect for any shipping damage. If damage has occurred, notify the carrier.
Table 5-1 Recommended Installation Tools & Materials
Tools and Materials
Safety Glasses
Safety Gloves
Safety Shoes
Hard Hat or Helmet
Hearing Protection
Crimping Tool or Solder Set
Wrenches
Screwdrivers
Multimeter (to verify power is turned off)
Torque Wrench
Drill
Knife or Scissors to Cut Crate Band
Wire Cutter/Stripper
RTV Silicone
1/2 inch or M12 Mounting Hardware (6 each)
Shop Rags
Hoist (minimum 500 lb (227 kg)
Note: Depending on the national and local standards and codes of practice, and the environ
-
ment, additional personal protective equipment may be necessary.
Saddle: 35 lb (16 kg)
200 lb (91 kg)
575 lb (261 kg)
(load at each mounting hole)
(load at each mounting hole)
(single point load in center)
Summary of Contents for Night Scan Chief 1.0
Page 2: ......
Page 6: ...PAGE 4 OF 80 NIGHT SCAN CHIEF OPERATING INSTRUCTIONS TP 4602001 T DECEMBER 2020 ...
Page 22: ...PAGE 20 OF 80 NIGHT SCAN CHIEF OPERATING INSTRUCTIONS TP 4602001 T DECEMBER 2020 ...
Page 55: ...PAGE 53 OF 80 NIGHT SCAN CHIEF OPERATING INSTRUCTIONS TP 4602001 T DECEMBER 2020 ...
Page 56: ...PAGE 54 OF 80 NIGHT SCAN CHIEF OPERATING INSTRUCTIONS TP 4602001 T DECEMBER 2020 ...
Page 57: ...PAGE 55 OF 80 NIGHT SCAN CHIEF OPERATING INSTRUCTIONS TP 4602001 T DECEMBER 2020 ...
Page 58: ...PAGE 56 OF 80 NIGHT SCAN CHIEF OPERATING INSTRUCTIONS TP 4602001 T DECEMBER 2020 ...
Page 59: ...PAGE 57 OF 80 NIGHT SCAN CHIEF OPERATING INSTRUCTIONS TP 4602001 T DECEMBER 2020 ...
Page 60: ...PAGE 58 OF 80 NIGHT SCAN CHIEF OPERATING INSTRUCTIONS TP 4602001 T DECEMBER 2020 ...
Page 62: ...PAGE 60 OF 80 NIGHT SCAN CHIEF OPERATING INSTRUCTIONS TP 4602001 T DECEMBER 2020 ...
Page 63: ...PAGE 61 OF 80 NIGHT SCAN CHIEF OPERATING INSTRUCTIONS TP 4602001 T DECEMBER 2020 ...
Page 64: ...PAGE 62 OF 80 NIGHT SCAN CHIEF OPERATING INSTRUCTIONS TP 4602001 T DECEMBER 2020 ...
Page 76: ...PAGE 74 OF 80 NIGHT SCAN CHIEF OPERATING INSTRUCTIONS TP 4602001 T DECEMBER 2020 ...
Page 81: ...PAGE 79 OF 80 NIGHT SCAN CHIEF OPERATING INSTRUCTIONS TP 4602001 T DECEMBER 2020 ...
Page 82: ...PAGE 80 OF 80 NIGHT SCAN CHIEF OPERATING INSTRUCTIONS TP 4602001 T DECEMBER 2020 ...