EZ RAZE Deployment
5.
Slide EZ RAZE top tube down through carriage and rotate
it until locating notches fully engage with the tube making
sure to align dimples for proper orientation.
Make sure
the restrain mechanism is the opposite direction as the
operator.
6.
Before deploying the mast tube sections, attach guy
lines to the top guy collar. Preferred method of attaching
the hook is to hook up through the guy plate on the EZ
RAZE top tube as shown.
7.
Align the guy stakes to coincide with the four holes on
the guy collar on the top of the mast (not required to align
for the swivel collar since it automatically adjusts to the
stakes) and place 90° apart.
See guy line instructions.
1.
To install the lift winch, insert the round key of the blue
winch into the tripod receiver below the blue
hold down
clamp.
5
6
7
8
www.antennamast.com
Do not duplicate, alter, or copy without the written consent of The Will-Burt Company. © Copyright 2013 The Will-Burt Company
12
Hold Down Clamp
Tripod Receiver