EZ RAZE Deployment
14.
Place the base tube (tube with the base plate
attached) into the bottom tube matching the locating
notches and aligning the dimples. Raise the base tube
until the locating notches are fully engaged. While holding
onto the base tube, loosen the clamp and slowly allow
mast tubes to be lower to rest on the ground. Tighten
clamp.
15.
Stake the base plate of the base tube by driving the
stake, with the hammer provided, at a point aligned with
pivot point of the base plate.
16.
Stake the base plate of the tube by driving the stake
through holes with the hammer provided. For masts 2m /
8 ft. to 12m / 40 ft. tall and smaller payloads, one stake
may be sufficient. For masts taller than 12m / 40 ft., two
stakes are required, depending on the soil type.
21
22
23
www.antennamast.com
Do not duplicate, alter, or copy without the written consent of The Will-Burt Company. © Copyright 2013 The Will-Burt Company
16