60
09
SECTION 2 - OPTIMUM OVAL SEMI IN GROUND AND IN GROUND POOL
ADD REBAR
STEP
9.1
Insert rebar through holes in channel and hammer
into the ground. Leave about 4” exposed above the
channel floor.
9.2
Sections of rebar have been provided. Drive rebar
through free hole on floor of bottom plates before
poring the concrete. Leave about 4” of rebar above
floor level.
9.1
9.2
Summary of Contents for Optimum OVAL
Page 1: ...1 OVAL INSTRUCTIONS 95 0771 by Wilbar...
Page 68: ...68 by Wilbar...