53
05
SECTION 2 - OPTIMUM OVAL SEMI IN GROUND AND IN GROUND POOL
STRAIGHT PANEL INSTALLATION
STEP
5.1
Place Straight Panel Connector 3” from end of
channel.
Place Straight Panel next to connector and slide a
52” spline into the inside seam to connect
the two—splines and seams must be free of
sand and dirt. If the spline sticks, apply cooking oil
(do not use petroleum lubricants like WD-40).
Slide short spline into outside seam between panel
and panel connector.
Slide extended spline into same track as the short
spline.
5.2
Slide a second short spline above the extended
spline.
5.1
5.2
52
"
Spline
Short Spline
Straight Panel
Connector
Channel
Short Spline
Extended
Spline
Summary of Contents for Optimum OVAL
Page 1: ...1 OVAL INSTRUCTIONS 95 0771 by Wilbar...
Page 68: ...68 by Wilbar...