1  General 

Depending on the type and design, WIKORA tanks are suitable for heating and / or storing DHW and / or heating water. The 
heating  is  achieved  indirectly  via  heat  generators,  if  applicable,  from  different  heat sources. The maximum working pressure 
and working temperature can be found in the technical data.  
 
Set-up, installation and commissioning must be undertaken by a qualified specialist, who must observe these instructions.  
 

The  site  of  installation  must  be  frost-protected  according  to  DIN  4753  and  should  be  in  direct  proximity  to  the  heat 
generator.  
 

When setting-up and installing the tank, the following regulations should be considered:  
In addition to the technical rules in force DIN 1988, DIN 18160, DIN 4753, DIN 4109, DIN 4708, DIN 4751 section 2-4 energy 
conservation law and VDE regulations are to be observed. Moreover, the relevant regulations of the suppliers as well as legal 
building regulations are to be considered.  
 

Important: 

The exhaust pipe must be at least as big as the safety valve outlet in width. It may not have more than 2 bends and 

should not be longer than 2 m. If for any compelling reasons 3 bends or a length up to 4 m are required, then the entire exhaust 
line must be designed one nominal size larger. More than 3 bends, or a length exceeding 4 m is prohibited. The exhaust pipe 
must be installed with downward gradient. The drain line behind the funnel must feature at least the double width of the valve 
entrance. A sign is to be attached close to the exhaust pipe of the safety valve or on the safety valve itself.  „For safety reasons 
water  may  leak  from  the  exhaust  pipe  during  the  heating  process!  Do  not  lock!  "The  operability  of  the  safety  valve  is  to  be 
checked at regular intervals by means of de-ventilation.

  

 

2  Transport and installation 

In order to prevent damage during transport, the packaging should only be removed at the site of installation. During shipment, 
it should be ensured that the tank does not come in contact with any spiky or sharp items, nor is damaged through dropping or 
knocks.  
During  installation,  the  tank  must  be  disconnected  from  any  humidity  carrying  components.    Moreover,  sufficient  space  for 
maintenance and cleaning purposes should be kept free in front of, beside, above and behind the tank. 

 

Please note that the insulation provided should be kept in a dry place at least 24 hours at a minimum temperature of 
20°C before installation. 
 

 

 

 
 

Summary of Contents for WPH 300

Page 1: ...nd maintenance record must be entirely completed and the user has to be instructed accordingly Efficient operation can only be guaranteed if the instructions of this manual are followed Warranty does...

Page 2: ...e longer than 2 m If for any compelling reasons 3 bends or a length up to 4 m are required then the entire exhaust line must be designed one nominal size larger More than 3 bends or a length exceeding...

Page 3: ...790 950 1905 1560 280 1560 280 1950 1480 940 280 WPH 980 790 950 2175 1830 280 1830 280 2200 1750 1060 280 WPH 1000 850 1010 1920 1590 280 1590 280 1980 1485 940 280 WPH 1500 1000 1160 2130 1710 340 1...

Page 4: ...with their application and supply medium Sensors and thermostats necessary for temperature control must be securely and permanently positioned on the tank immersion sleeve and sensor rail The tank s...

Page 5: ...operation and lifetime of the system depend decisively on a regular maintenance 7 Maintenance and wear parts Regular maintenance increases the lifetime and operation reliability of the system Decalci...

Page 6: ...O Duo 302 403 502 753 1000 1502 2002 5 20 27 WBO Basic Integral 302 5 20 27 WP Sol 302 403 502 750 5 20 27 WBO H 300 400 500 750 1000 5 20 27 WTL 120 150 200 300 5 20 27 GS 117 152 192 5 20 27 Wikosol...

Page 7: ...operation and maintenance Place Date Customer Installer Signature Signature Place of installation Name ZIP Code Place Street Phone Tank model Serial number Date of invoice In the case of reclamation t...