Installation, operating and maintenance manual
UNIGAS 300
DDG6004MHGB/08-2017/Rev.A2 Software version from M 1.3.40 and D 2.3.37
24
Menu functions
1. Current values
►
1-1: Cf, C, Z, Z/Zb, p, t.
2. Parameters
►
2-1: CO
2
, H
2
, N
2
, d, H
s
, Z/Zbfix
▼
2-2: tmeas, tb, pb
▼
2-3: pmin, pmax, tmin, tmsx, pfix, tfix
3. Flow rate
►
3-1: Qc1_5, Qc_ nx5, Qc1_inst, Vc1_60.
▼
3-2: Qb1_5, Qb1_nx5, Qb1_inst, Vb1-60.
4. Interval logger
►
4-x: Date, date selection using
▼
and
▲
►
4-x-1: interval, into for selection using
▼
and
▲
►
4-x-x-x: Vm1, Vb1, Vc1, Vb1err
►
◄
4-x-x-xa: Vm2, Vm3, t, p, status registers 1, 2, 3
5. Day logger
►
5-x: Day logger, day selection using
▼
and
▲
►
5-x: Vm1, Vb1, Vc1, Vb1err
►
◄
5-xa: Vm2, Vm3, t, p, status registers 1, 2, 3
6. Month logger
►
6-x: Month logger, month selection using
▼
and
▲
►
6-x: Vm1, Vb1, Vc1, Vb1err
►
◄
6-xa: Vm2, Vm3, t, p, status registers 1, 2, 3
7. Inputs and
outputs
►
7-1: Inputs/outputs: INP1DIV, INP2DIV, INP3DIV, OUT1DIV, OUT2DIV
7-2 to 7-5: Coefficients for gas meter error curve correction
8. Status
►
8: Status, actuating
▼
and
▲
and subsequently
►
select a status register
►
8-1-x: Conversion; status register 1
Actuating
►
resets the status register. An alarm cannot be
reset until the cause of that alarm no longer exists
►
8-2-x: Operation; status register 2
►
8-3-x: Alarm; status register 3
See chapter 10 for more information
Remark: if there are no messages, that fact will be reported on the screen
9. System
►
9-1: Serial, Version M, Version D, Operation, CRC M, CRC D
▼
9-2: Gas meter, P meter, T meter, Time, Date
▼
9-3: Dev addr, EAN code
10. Battery
►
10-1: Status
►
10-1-1: Status: U batt, AH used, AH new
►
10-2: Replace
See chapter 8, Replacing the battery
11. Modem
►
11-1: Status: Network, Commh, Maincell, Ubatt
►
11-2: Switching on the modem, by actuating
►
the modem is switched on
for 30 min
12. Adjusting
►
12-x: p_offset, tcorr_min, tcorr_0, tcorr_max
See chapter 7; Maintenance
13. Language
►
13-x: language setting English, Dutch
▼
and
▲
for selecting
►
for activating
◄
to return
14. Display test
►
display with changing checker board pattern
Remarks:
•
Menu numbers are given in grey.
•
When menu items 1 and 3 are selected, the measuring interval for pressure and temperature is
temporarily reduced to 5 s.
•
Menu 1: when the calculation of Z and Zb is disabled, Z is displayed without a value and Z/Zb is displayed
as “Z/Zbfix”.
•
Menu 1: When the calculation of Z or Zb is not possible, Z is displayed with “ERROR” and Z/Zb is
displayed as “Z/Zbfix”.
Summary of Contents for UNIGAS 300
Page 1: ...Installation operating and maintenance manual UNIGAS 300...
Page 2: ......
Page 55: ......