PAGE OF
3
8
C
Secure the HDPE slide frame to the front of the deck and the upright posts as illustrated in Detail View C. Ensure there are no gaps between the posts and
the HDPE slide frame, any gaps can be eliminated by maneuvering the posts labelled 'O' and the triangle deck.
DETAIL C
With the HDPE slide frame secured attach the stainless steel slide using the supplied Button
Head Screws. A drill hole may have to be created to go through the timber deck so the
steel slide can attach securely to the HDPE panel and the Triangle Timber Deck.
With the deck assembly complete and the correct shape achieved, concrete can
now be added to the four foundation holes for this part of the unit.
11
18
23
10
18
19
23
9
12
18
19
23
6
18
18
19
23
8