Secure the HDPE slide frame to the front of the deck and the upright posts as illustrated in Detail View C. Ensure there are no gaps between the posts and 
the HDPE slide frame, any gaps can be eliminated by maneuvering the posts labelled 'O' and the triangle deck.

DETAIL C

With the HDPE slide frame secured attach the stainless steel slide using the supplied Button 
Head Screws. A drill hole may have to be created to go through the timber deck so the 
steel slide can attach securely to the HDPE panel and the Triangle Timber Deck.

With the deck assembly complete and the correct shape achieved, concrete can
now be added to the four foundation holes for this part of the unit. 

11

18

23

10

18

19

23

9

12

18

19

23

6

18

18

19

23

8

Summary of Contents for PICUS Series

Page 1: ...ATION DETAILS 1 READ INSTALLATION INSTRUCTIONS THROUGHLY BEFORE COMMENCING INSTALLTION OF UNIT 2 EXCAVATE FOUNDATIONS USING THE DETAIL AS SHOWN ON PAGE 2 OF THIS DOCUMENT 3 ENSURE TO CHECK AND TIGHTEN...

Page 2: ...0 0 7 4 8 0 7 4 8 0 820 0 775 0 576 5 1195 0 1057 0 705 0 FOUNDATIONS 350MM X 350MM X 600MM DEEP UNLESS OTHERWISE SPECIFIED 1845 0 245 0 1038 5 854 0 1473 0 916 5 301 5 799 0 344 0 151 0 648 0 900 X 3...

Page 3: ...ETPOUR SURFACING 21 6 LINEAR METRES WETPOUR EDGING 7103 0 6193 0 946 6 2414 0 2098 6 3101 8 1532 5 1532 5 2768 3 1605 2 1306 3 1185 1 926 3 1537 3 1489 7 8000 0 7000 0 29 GRASS SAVER TILES 1 5M X 1 0M...

Page 4: ...FRMT01023 GROUND ANCHOR SCRAMBLE NET 6 4 M10X40BHSS M10 x 40 Socket Button Head SS 7 2 SS ANCHOR SLIDE GROUND ANCHOR 8 1 FRMT00796 900 SS SLIDE 9 4 SSB505090R 50 X 50 X 125 DIA POST BRKT 10 4 M10X35BH...

Page 5: ...uide NOTE Do not fully tighten the Washer Screws until the unit has been assembled SURFACE LEVEL 814 5 900 0 N N N O O SLIDE DETAIL B 11 18 23 The counterbore holes will point in the direction of an o...

Page 6: ...e deck DETAIL C With the HDPE slide frame secured attach the stainless steel slide using the supplied Button Head Screws A drill hole may have to be created to go through the timber deck so the steel...

Page 7: ...cure post labelled A to the lower hole on post I and fix using the supplied Coach Bolt The upper end of post A is fixed to post N on the triangle deck using a Coach Screw to the dimension shown below...

Page 8: ...under post G onto post K The other side of post B is secured to the triangle deck post using a Coach Screw as positioned below G B K NOTE The Dimensions for the pre drilled holes below are mearly a re...

Page 9: ...to the tirangle deck frame with the supplied Coach Screws as illustrated L M C D L M NOTE The Dimensions for the pre drilled holes below are mearly a reference to using the correct hole on the uprigh...

Page 10: ...ucture securing with M10 X 120 Coach Screws NOTE Post H Sits on the underside of an existing log and is secured with an M12 x 200 Coach Bolt The hole for this Coach Bolt will need to be positioned and...

Page 11: ...H THE ROPES Finally with the structure complete the ropes can be secured to the correct upright posts With the unit loosely connected the posts should be able to lean to the desired angle and to achie...

Reviews: