![Wicksteed PICUS Series Manual Download Page 5](http://html1.mh-extra.com/html/wicksteed/picus-series/picus-series_manual_978827005.webp)
PAGE OF
2
8
DETAIL A
BUILD TRIANGLE PLATFORM WITH SLIDE
Excavate the foundations as detailed using sheet PICUS3-SPEC. Using posts labelled 'O' loosely secure to the upright posts labelled 'N' using the supplied
Washer Screws to the dimensions detailed below. Pay strict attention to the direction of the counterbore holes on posts 'N' as these will have to be facing the
correct direction for the rope attachment detailed later on in this installation guide. NOTE: Do not fully tighten the Washer Screws until the unit has been
assembled.
SURFACE LEVEL
8
1
4
.5
9
0
0
.0
N
N
N
O
O
SLIDE
DETAIL B
11
18
23
The counterbore holes will point in the direction of an opposite post/
foundation as illustrated with the arrows in Detail View A. The counterbore
will be on the opposite side to the arrow head.
With the three posts formed secure the triangle deck frame to the three
upright posts using the supplied Coach Screws as shown in Detail View B.
Once the frame has been established, the decking can be laid on top and
secured using the supplied assy screws.
8
1
0
.5
7
5
5
.0
SECURE USING SUPPLIED
M8 X 140 WASHER SCREWS