PAGE OF
6
8
Prop posts labelled 'L' & 'M' into the foundation hole. Loosely secure post 'C' & 'D' to posts 'L' & 'M' using the supplied Coach Bolts. Attach the other ends
of posts 'C' & 'D' to the tirangle deck frame with the supplied Coach Screws as illustrated.
L
M
C
D
L
M
NOTE: The Dimensions for the pre-drilled holes below are mearly a reference to using
the correct hole on the upright post. If made to the correct these posts shouldn't require drilling.
SECURE USING
M12 X 220 COACH BOLTS
SECURE USING
M12 X 150 COACH SCREWS
6
4
0
.0
5
8
5
.0
3
4
3
.0
2
9
0
.0