background image

PAGE     OF  

1

4

Wicksteed Leisure Ltd, Digby Street, Kettering, Northants NN16 8YJ    Tel: 01536 517028   Fax: 01536 410633

www.wicksteed.co.uk   E:[email protected]

No part of this document may be copied or used without the express written permission of WICKSTEED LEISURE LTD (c) 2013

FFH

SIZE

AGE RANGE

PROD. CODE

TECHNICAL DATA

MINIMUM SPACE REQUIRED

SUPERVISED PLAY

EQUIPMENT TYPE

LARGEST PART

RECOMMENDED

HEAVIEST PART

INSTALLATION DETAILS

1. READ INSTALLATION INSTRUCTIONS THROUGHLY BEFORE COMMENCING INSTALLATION OF UNIT
 
2. EXCAVATE FOUNDATIONS USING THE DETAIL AS SHOWN ON PAGE 2 OF THIS DOCUMENT
 
3. ENSURE TO CHECK AND TIGHTEN ALL FIXINGS USING PROTECTIVE CAPS WHERE NECESSARY
 
4. BACKFILL FOUNDATIONS WITH              CUBIC M CONCRETE ALLOWING TO SET FOR 48 HOURS
 
5. REMOVE ALL ASSEMBLY AIDS BEFORE THE EQUIPMENT IS USED

THIS PRODUCT CONFORMS WITH BS EN1176-    :2008

Version:
Date:

ACTION AND ADVENTURE

PICK UP STICKS 'TWELVE'

PICUS12

L: 10.75M W: 7.93M H: 2.4M

2.2M

7+ YEARS OLD

13.33M X 11.22M

HIGH LEVEL

4.9M X 0.125

36KG (POST 011)

0.096

1

B
12/11/13

Summary of Contents for PICK UP STICKS TWELVE

Page 1: ...INSTALLATION DETAILS 1 READ INSTALLATION INSTRUCTIONS THROUGHLY BEFORE COMMENCING INSTALLATION OF UNIT 2 EXCAVATE FOUNDATIONS USING THE DETAIL AS SHOWN ON PAGE 2 OF THIS DOCUMENT 3 ENSURE TO CHECK AND...

Page 2: ...122 5 2071 5 2053 5 1650 0 1760 0 2150 0 1600 0 2150 0 1600 0 2150 0 2780 0 2806 0 3988 0 3098 0 2578 0 2705 0 2488 0 2766 0 3092 0 3155 0 2856 0 3129 0 2104 0 2104 0 2006 0 2006 0 FOUNDATION PLAN 1 5...

Page 3: ...PAGE OF 3 4 MINIMUM SPACE 105 8 SQ METRES WETPOUR SURFACING 38 7 LINEAR METRES WETPOUR EDGING SCALE 1 70 A4 13002 0 11215 0 1080 5 1819 0 1176 0 1688 0 1763 0 1670 0...

Page 4: ...PAGE OF 4 4 SCALE 1 70 A4 87 GRASS SAVER TILES 1 5M X 1 0M MINIMUM SPACE 13500 0 12000 0 4800 0 5050 0 1334 0...

Page 5: ...12 IN AY AK OF 1 16 31 07 13 Parts List ITEM QTY PART NUMBER DESCRIPTION 1 1 FRTB00800 PICUS12 TIMBER SET 2 1 FRMS00802 PICUS12 ROPE SET 3 34 M12X180CHS M12 x 180 CHS 4 5 M12X230CB M12 x 230 Coach Bol...

Page 6: ...t prop and concete posts 001 002 into the corresponding foundation holes ensuring the posts are rotated correctly to aid with later stages of this installation Prop posts 003 006 into the foundation h...

Page 7: ...in the correct places Use the below diagram to position post 014 into the correct pre drilled hole 014 021 003 001 006 011 012 004 6 7 8 9 3 7 9 SURFACE LEVEL 1687 0 With post 014 positioned in place...

Page 8: ...PAGE OF 4 16 2150 0 950 0 400 0 690 0 960 0 900 0 397 0 655 0 700 0 395 0 1290 0 405 0 880 0 1600 0 003 004 014 021 011 012 NOTE Use dimensions to measure parallel to posts 011 012 2150 0...

Page 9: ...the pre drilled holes post 009 does not have a pre drilled hole to secure post 015 so this will need to be pre drilled prior to securing with a Coach Bolt Ensure post 009 has a scollop at the top of...

Page 10: ...rated Coach Screws There are two extra double counterbore holes on post 008 Ensure these holes are approximately guided towards post 005 as these will be used to fit a rope walk 5 7 9 6 7 8 9 SURFACE...

Page 11: ...o posts 007 006 As with the other posts pay particular attention to the position of the pre drilled counterbore holes which will later be used to secure a rope structure Use the image on page 1 as a r...

Page 12: ...pt a Coach Bolt so will require drilling on site Line up post 017 to the underside of post 018 using the below dimensions and drill a hole through Secure with the supplied Coach Bolt Next line up post...

Page 13: ...to center post 022 posts 022 023 do not have a pre drilled hole to secure post 024 025 so this will need to be pre drilled prior to securing with a Coach Bolt Repeat this step for 025 027 005 023 NOT...

Page 14: ...ensure the double counterbores are positioned in the correct places Use the below diagram to position post 014 into the correct pre drilled hole 1688 0 SURFACE LEVEL With post 014 positioned in place...

Page 15: ...PAGE OF 11 16 2150 0 1600 0 650 0 700 0 400 0 950 0 400 0 700 0 1075 0 800 0 750 0 405 0 420 0 820 0 014 021 026 027...

Page 16: ...t 025 mark and pilot hole before securing post 030 to post 025 using the supplied Coach Screw 028 037 030 029 008 3 7 9 6 7 8 9 220 0 700 0 550 0 1350 0 028 029 030 005 008 037 250 0 025 Position post...

Page 17: ...d secure using the supplied Coach Bolt Rest the other end of post 032 onto horizontal support beam 025 Position so that the hole is approx 1670mm from the end and mark position remove the log and dril...

Page 18: ...p supported Offer post 036 against and on the outside of posts 033 026 Use the pre drilled holes and secure post 036 to the upright posts using the supplied Coach Bolts 033 036 026 6 7 8 9 033 026 036...

Page 19: ...the opposite beam labelled 024 to ensure the rope is appropriately tensioned 850 0 735 0 4 7 8 9 024 As illustrated position post labelled 035 agianst upright post 033 lining up the counterbore hole...

Page 20: ...has set all fixings can be fully tightened and protective caps can be installed LONGEST ROPE 10 5m approx length attaches to posts 005 001 007 004 TRIANGLE ROPE attaches to posts 005 001 007 004 SHORT...

Reviews: