![Whitmore LUBRICURVE ELECTRO 5 Installation & Maintenance Manual Download Page 8](http://html1.mh-extra.com/html/whitmore/lubricurve-electro-5/lubricurve-electro-5_installation-and-maintenance-manual_977318008.webp)
8
7
Site Preparation
To install a LubriCurve Electro 5 lubricator, a simple base is required to support the vertical pole or the
rotational frame on which the Cabinet is mounted. The form and stability of the base is important as it
resists the wind loads on the cabinet. For a pole mount the base would typically be formed from
concrete with a 60mm diameter tube cast vertically. The tube is approximately 1000mm above the
concrete surface. For a rotational frame, the base could be either concrete or two full length sleepers.
Either construction the surface of the base must be flat.
Outline and requirements are indicated in the diagram below. Drawings are applicable to Electro 5 pole
& rotational frame mounting systems. Suitable poles and frames are available from Whitmore Rail.
B a s ic S p e c ific a tio n .
S in g le c h a m b e r g e a r p u m p w ith 1 2 v
d c m o to r
I n t e r n a l r e s e r v o ir a p p r o x im a y tle y 1 2 ,5
K g c a p a c ity
1 2 v d c o p e r a t io n v ia 1 0 0 a h le a d a c id
b a t t e r y
1 1 0 / 2 2 0 v M a in s c h a r g in g o r 1 2 v d c
s o la r p a n e l c h a r g in g v e r s io n s
W e ig h t o f c a b in e t ( e m p ty )
a p p r o x im a t le y 9 5 k g
M o u n t e d o n s in g le v e r tic a l p o le
a p p r o x im a t le y 3 5 0 m m a b o v e g r o u n d
le v e l
P o le f ix e d in c o n c r e t e o r b o lte d to
s le e p e r s b u r ie d in th e b a lla s t.
1
2
0
0
3
5
0
T y p ic a l in s t a lla t io n - P o le m o u n te d
D C 3 1 T
C o n tr o l
B l u e P o w e r 1 2 /1 0
5 3 0 .0 0
2 8 0 .0 0
8
8
5
.0
0
N o t e !
F r o n t o p e n in g d o o r fo r
m a in t e n a n c e
& a c c e s s t o c o n tr o l
p a n e l
'X '
'X '
'Y '
'Y '
D C 3 1 T
M i d l a n d P u m p
B i r m i n g h a m U K
N o t e !
T o p o p e n in g lid to fill
r e s e r v o ir w ith g r e a s e
N o t e !
B a t t e r y a c c e s s th r o u g h
f r o n t o p e n in g d o o r
S e c t io n o n 'X - X '
V ie w o f F r o n t o f C a b in e t
s e c t io n o n 'Y - Y '
N o t e !
O p t io n a l 3 6 w S o la r p a n e l
c a n b e m o u n t e d o n r e a r o f
c a b in e t a n d t h e c a b in e t c a n
b e t u r n e d t o g iv e c o r r e c t
o r ie n t a t io n - T h e s o la r p a n e l
t o b e u s e d w it h r o ta tio n a l
f lo o r s ta n d
V ie w o f R e a r o f C a b in e t
T y p ic a l in s t a lla tio n -
1
1
9
0
.0
0
3
0
0
.0
0
R o t a t io n a l F lo o r S ta n d
N o t e !
S e c t io n s h o w n w ith
lu b r ic a t o r m o u n te d o n
a v e r t ic a l p o le
( w it h o p t io n a l S o la r p a n e l)
N o t e !
R e a r v ie w s h o w n o n
r o t a t io n a l f lo o r s ta n d
Base and cabinet must be positioned to maintain mandatory track and OLE clearances.
Vegetation should be cleared around the unit where necessary to ensure a safe working
environment.
The base should be securely bedded into the ground / ballast to ensure stability and tube to be
vertical
Summary of Contents for LUBRICURVE ELECTRO 5
Page 30: ...30 ...