F
CONDENSING UNIT
55
°
F
BOTTLE PROBE
5/8
” suction line
1/4
” liquid line
1/4
” liquid line
18-5 THERMOSTAT
WIRE
DISPLAY CABLE
PRIMARY
EVAPORATOR UNIT
S
ECONDARY
EVAPORATOR UNIT
DISCHARGE LOCATION
DISCHARGE LOCATION
POWER CABLE
POWER CABLE
ITEMS TO ROUTE BEFORE INSTALLING THE EVAPORATOR UNITS
1.
Route the refrigerant lines from each evaporator unit toward each other using
1/2
"
OD copper tubing for the suction line and 1/4” OD
tubing for the liquid lines.
2.
Join both suction lines together using a
1/2"
T-fitting. Install a
5/8
” to
1/2
"
reducer at the outlet of the
T-fitting. The remainder of the
suction
line from the T-fitting to the condensing unit will need to be
5/8
” OD copper tubing.
3.
Join both liquid lines together using a
1/4"
T-fitting. Install a
3/8"
to 1/4” reducer at the inlet of the T-fitting. The remainder of the
liquid
line
from the T-fitting to the condensing unit will need to be
3/8"
OD copper tubing.
4.
Route the display cable from the desired location to the desired
primary
evaporator unit installation location
.
5.
Route the bottle probe cable from the desired thermostat bottle location to desired
primary
evaporator unit installation location
.
6.
Route the drain lines from a proper discharge location to desired evaporator unit installation locations
.
7.
Route the power cable wiring to the desired evaporator unit installation locations.
8.
Route an 18-5 thermostat wire between the desired evaporator unit installation locations.
55
°
F
1/2" suction line
1/2” suction line
2
2
0V 60Hz 1 PH 15-amp
dedicated circuit
POWER CABLE
24V COMMUNICATION CABLE
3/8" liquid line
Page 10
08/04/21