19 of 31
8 FINAL CHECK OF ASSEMBLED LIFT
1. Final dimension check after anchoring.
____
2. Check for hydraulic leaks.
____
3. Re-check level of decks, front to rear, side to side.
____
4. Check torque of anchor bolts.
____
5. Check all fasteners, tighten if necessary.
____
6. Operate lift to full stroke then lower to ground while checking
____
for proper functionality.
7. Ensure Customer Care Kit is complete and given to operator.
____
a. Operation Manual
____
b.ANSI / ALI Lift It Right Manual
____
c. ANSI / ALI Safety Tip Card
____
d.ANSI / ALI ALIS Safety Requirements for Installation
____
and Service of Automotive Lifts
e. ANSI / ALI Quick Reference Guide
____
8. Train end user on operation of lift.
____
9 OPERATION TEST WITH VEHICLE
1. Lower lift to ground.
2. Drive vehicle on to lift.
3. Raise lift to and lower onto 3-4 lock positions during full rise to ensure all locks are
working correctly.
4. Check lowering speed and smooth decent rate.
5. Lower lift to ground and drive vehicle off lift.
If any problems occur during the final checkout or operation of the lift please contact customer
service at 1-800-268-7959