
19
UPPER BUNK ASSEMBLING
23.
With the pilot holes as a guide, align and attach one Guardrail Support (R) to the center of the Long
Guardrails (P) and the Upper Mattress Side Rail (N) by using three 30 mm Screws (10) through the
countersunk holes and screw into place. As shown above.
24.
Repeat the same procedure to attach the other Guardrail Support (R) to the Short Guardrails (O) and the
Ladder Side Rail (M).
Ø4 mm x 30 mm Screw
(6 used in this step)
⑩
M
O
O
R
R
P
P
N
10
10
UP
UP