
16
UPPER BUNK ASSEMBLING
18.
Insert the 50 mm Wood Dowels (7) into the drilled large holes of Long Guardrail (P) at both ends. Attach
two Long Guardrails (P) and the Upper Mattress Side Rail (N) between Upper Posts (F and H) using
eight 110 mm Bolts (1) and eight Barrel Nuts (12), as shown above. Make sure that the wood stoppers for
slat attached on the side rail are up and face inward.
19.
Attach the Ladder Side Rail (M) between the Upper Posts (E and G) using four 110 mm Bolts (1) and
four Barrel Nuts (12). Make sure the wood stoppers for slat attached on side rail are up and face inward.
Ø1/4” x 110 mm Bolt
(12 used in this step)
①
N
7
7
F
E
M
N
P
P
H
G
L
K
K
L
M
P
P
K
L
E F
G H
1
1
12
12
12
Ø10 x 50 mm Wood Dowel
(4 used in this step)
⑦
Barrel Nut
(12 used in this step)
⑫