
18
UPPER BUNK ASSEMBLING
21.
Insert the 50 mm Wood Dowels (7) into the end large holes of Short Guardrails (O) as a guide. Attach
two Short Guardrails (O) between the Upper Headboard Front Post (G) and Front Guardrail Post (Q)
using four 110 mm Bolts (1) and four Barrel Nuts (12).
22.
Fasten the Front Guardrail Post (Q) to the Ladder Side Rail (M) with two 38 mm Bolts (3), using the
enclosed Allen wrench.
Ø1/4” x 110 mm Bolt
(4 used in this step)
①
BARREL NUT
(4 used in this step)
⑫
Ø1/4” x 38 mm Bolt
(2 used in this step)
③
Ø10 x 50 mm Wood Dowel
(4 used in this step)
⑦
M
O
O
Q
G
Q
M
Q
M
3
O
7
7
12
12
O
1
G Q