
WD-59CTS & WD-66CTS
Rev. (202210)
Installation instructions
13
4.
Chain
5.
Cover plate
6.
Drainage plate
7.
Lower track
8.
Belt tensioner
9.
Cover plate
10.
Overflow pipe
3.5.3
Assembly of sections
•
Remove any transport supports.
•
Position section 2 where you want it and adjust the height (see machine
drawing). Check that the section is horizontal using a spirit level on the tank
body. Adjust the machine using the legs.
•
Fit the lengthening joints to the stand on section 2.
Mounting the connecting tube
A = Leg
B = Stand
C = Lengthening joint
D = Screws
•
Position section 1 next to section 2 so that the rectangular metal pieces on
the stands of both sections are aligned. Check that section 1 is horizontal
using a spirit level on the tank body. Adjust using the legs.
•
Push section 1 against section 2 until the rectangular metal pieces on the
stand are pushed close to each other, but do not push the sections
completely together. There should still be a gap between them in order to
apply the silicone around the openings.
Skarvrör
A
D
B
C