![Westinghouse KC-4 Installation, Operation & Maintenance Instructions Manual Download Page 72](http://html.mh-extra.com/html/westinghouse/kc-4/kc-4_installation-operation-and-maintenance-instructions-manual_965511072.webp)
T Y P E
K C-4
BREAKER
L I N E
BUS
BREAKER
STATION BUS PHASE ROTATION A , B , C
r - - - - - ,
PRIMARY
§
I
I
RELAYS
I
I
I
' - - - -
-
-'
50
50
r - - - - - ,
I
PHASE
A
OEV. NO.
TYPE
FUNCTION
TR8 2
ZENER TRIPPING UNIT
50
KC-4
OVER CURRENT DETECTOR
50 X
OVERCURRENT AUX.(OPTIN-IALI
52
POWER CIRCUIT BREAKER
BREAKER FAILURE TIMER
62X
BKR. fAIL. I N I TIATING AUX.
BKR FAIL. I N I T IAT I N G AUX
868
LOCKOUTAUX
878
BUS OIFF. R E LAY
9< T
T R I P P I N G AUX.
DWG. NO
187A696
IBSA640
3500A85
3515A17
3500A85
3500A85
3500A68
A:HIGH- T H R E S H O L O TYPE"I4MS PICKUP}
BLOCKING ZENER BUT NOT BOTH.
t
:OPTIONAL FOR SEAL-IN Of 62X MO 62Y CONTACTS.
4'
• g�v�WlolR:OR CONTACT MULTIPLICATION Of KC-4 OVERCUR R E N T
...
125¥0
NEG.
_r:--+
L___.
_r:--+
L___.
_r:--+
L___.
_r:--+
L___.
r---- :��CK
L___.
r--
L___.
BACKUP
4
PROT
8 6 8 F ( O N F P E R B K N i
..c--
T R A N S F E R
�
TRIP
C
B R E A K E R FAILURE
T I M E R C K T
C
PRIMARY
T R I P CKT
C
BACKUP
T R I P CKT
OTHER
BREAKER
CIRCUITS
�
142 7C9 5
Sub 9
Fig.
3.
External Connections for the KC-4 Relay - Breaker Failure Protection of a Single Bus/Single Breaker A rrangemen t
with One Timer per Breaker.
set to accommodate the slowest breaker. Sep
arate timers provide faster backup clearing
for fast breakers.
(3)
With separate timers, the bus can be recon
figured without rewiring the breaker failure
circuits.
(4) I f B F I seal-in is needed it is easy to obtain
with separate timers. With a single timer,
auxiliary relays and blocking diodes must be
added whose cost mitigates the timer savings .
B R EAKER-AND-A- H AL F ARRANGEMENT
Figure 4 show breaker-failure protection cir
cuits for a breaker-and-a-half bus arrangement,
with one timer for each breaker.
The basic functioning of the scheme of figure 4
I S
the same as for the single bus-single breaker
case.
First, consider the breaker
1
failure detection
6
circuit as an example for a breaker adj acent to a
bus. Breaker-failure timing is initiated not only
for faults on line A, but on bus L as well. A uxiliary
relay
62Z-L
in the
Bus-L
clearing circuit provides
B F I to breaker-failure schemes for breakers l , 4,
and others on bus L whenever a bus fault occurs
and bus differential relay 878-L operates.
For a bus fault on L and a failure of breaker 1 ,
the timer 62 will energize lockout switch 86BF
directly which will in turn cause tripping and re ..
close blocking of b reaker 2 and transfer tripping
of breakers at the remote end of line A. The timer
62 also energizes lockout switch 868-L through
a
T RB-2 blocking diode; this is not detrimental but
is redundant since 868-L was already tripped by
the bus relay 878- L .
Now consider a fault o n line A and a failure:
of breaker
1 .
BFI is provided by 62X and Y . The
timer 62 will energize 86Z and 868-L through
T R B-2 as j ust described. In this case, breaker
2
and remote-breaker tripping were already accom-
www
. ElectricalPartManuals
. com
Summary of Contents for KC-4
Page 2: ...TYP E K C 4 R ELA Y 2 ai 0 lJ w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Page 22: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Page 23: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Page 39: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Page 63: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Page 66: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Page 84: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Page 86: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Page 113: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Page 148: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Page 149: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Page 176: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Page 177: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...