3. A
SSEMBLY
W
ESTFIELD
- G
RAIN
A
UGERS
W130 - 31’ & 36’ PTO-SD & EMD
18
30749 R0
3.5. TWO-STAGE DRIVESHAFT
See Figure 3.6.
Upper sections of the driveshaft are factory installed. To install the lower section
follow the steps below.
1. Clean paint and dirt from driveshaft end and shaft connectors.
2. Slide shaft connector halfway onto the upper pre-installed driveshaft.
3. Slip lower driveshaft through bearings on lower tube section. Install a square
key, and slide into shaft connector.
4. Place a few drops of oil at each driveshaft bearing to allow for break-in.
5. Tighten all set screws on shaft connectors.
Figure 3.6
3/8” X 3/4” BOLTS
3/8” NUTS
1-1/4” WOOD
BEARING
1/4” X 1-1/2”
SHAFT CONNECTOR
UPPER SHAFT
LOWER SHAFT
SET SCREWS
SQUARE KEY
SECTION
1/4” X 1-1/2”
SQUARE KEY
CASE
BEARING
BEARING
CASE
SECTION
Summary of Contents for W130-31
Page 6: ...1 INTRODUCTION WESTFIELD GRAIN AUGERS W130 31 36 PTO SD EMD 6 30749 R0 ...
Page 14: ...2 SAFETY WESTFIELD GRAIN AUGERS W130 31 36 PTO SD EMD 14 30749 R0 ...
Page 30: ...3 ASSEMBLY WESTFIELD GRAIN AUGERS W130 31 36 PTO SD EMD 30 30749 R0 ...
Page 34: ...4 TRANSPORT PLACEMENT WESTFIELD GRAIN AUGERS W130 31 36 PTO SD EMD 34 30749 R0 ...
Page 40: ...5 OPERATION WESTFIELD GRAIN AUGERS W130 31 36 PTO SD EMD 40 30749 R0 ...
Page 44: ...6 MAINTENANCE STORAGE WESTFIELD GRAIN AUGERS W130 31 36 PTO SD EMD 44 30749 R0 ...