3. A
SSEMBLY
W
ESTFIELD
- G
RAIN
A
UGERS
MK 130 P
LUS
X
61’ - 81’
34
30259
4. Attach other lift cylinder to left side of welded bracket with four 7/16” x 1-1/4”
bolts and locknuts. Tighten securely (see Figure 3.12 for correct position).
Note:
Although the lift cable is factory installed on the cylinder, make sure that the
cable clamps on the cylinder are secure and the cables are properly seated in
the cable sheaves before attaching the cable to the track shoe.
5. With both cylinders in full down position and track shoe resting against the
track stop, thread both cables over the cable-attach-rod on the track shoe.
Pull cable very tight, then secure with three 5/16” cable clamps on each
cable, positioned as shown (Figure 3.21). Tighten securely. Tie up excess
ends of lift cable with tape or ty-wrap.
Figure 3.21
Important:
Lift cable will stretch with initial use. Check frequently and adjust.
6. Attach the cable-roller to the appropriate location with two 7/16” x 1-1/4” bolts
and locknuts (Figure 3.25).
CAUTION
Track shoe must rest against track stop when
adjusting cable.
If this isn’t done, the auger can raise higher
than designed to lift, resulting in damage to
auger and possible injury to personnel.
Summary of Contents for MK 130 PLUS 71
Page 6: ...1 INTRODUCTION WESTFIELD GRAIN AUGERS MK 130 PLUS X 61 81 6 30259 ...
Page 18: ...2 SAFETY FIRST WESTFIELD GRAIN AUGERS MK 130 PLUS X 61 81 18 30259 ...
Page 32: ...3 ASSEMBLY WESTFIELD GRAIN AUGERS MK 130 PLUS X 61 81 32 30259 Figure 3 19 ...
Page 50: ...3 ASSEMBLY WESTFIELD GRAIN AUGERS MK 130 PLUS X 61 81 50 30259 ...
Page 72: ...7 TROUBLESHOOTING WESTFIELD GRAIN AUGERS MK 130 PLUS X 61 81 72 30259 ...
Page 74: ...8 APPENDIX WESTFIELD GRAIN AUGERS MK 130 PLUS X 61 81 74 30259 ...