13
27. Route the Low Cable (48) over a 90mm Pulley
(34). Attach the Pulley, a Cable Trap (36), and
two Finger Guards (35) to the lower set of holes
in the “U”-bracket (43) with an M10 x 52mm Bolt
(52) and an M10 Nylon Locknut (68).
Make sure
that the Cable Trap is oriented to hold the
Cable in the groove of the Pulley.
28. Route the Low Cable (48) under a 90mm Pulley
(34). Attach the Pulley, a Cable Trap (36), and
two Finger Guards (35) to the Upright (3) with an
M10 x 100mm Bolt (46), two M10 Washers (70),
and an M10 Nylon Locknut (68).
Make sure that
the Cable Trap is oriented to hold the Cable in
the groove of the Pulley.
26. Wrap the Low Cable (48) under a 90mm Pulley
(34). Attach the Pulley and two Finger Guards (35)
to the bracket on the Base (1) with an M10 x
46mm Bolt (53) and an M10 Nylon Locknut (68).
35
35
68
34
1
48
53
26
34
48
35
36
35
52 43
68
27
70
48
36
70
68
35
35
34
3
28
29. Attach the Low Cable (48) to the Leg Lever (9)
with the M8 x 64mm Shoulder Bolt (56), an M8
Washer (71), and an M8 Nylon Locknut (69).
71
9
69
46
56
48
29
Summary of Contents for Gym 750
Page 19: ...19 NOTES ...