background image

8

220 V

TRAŞLAMA BASINCI

Summary of Contents for ELBOR CNC W400

Page 1: ...CNC W400 PLAST K BORU MONOFAZE H DROL K ALIN KAYNAK MAK NES KULLANMA KILAVUZU CNC W400 PLASTIC PIPES MONOPHASE HYDRAULIC BUTT WELDING MACHINE USER MANUAL CNC W400 www elbor com tr...

Page 2: ...R K KONTROL N TES HYDRAULIC POWER PACK WITH ELECTRIC CONTROL UNIT 7 ALIN KAYNAK MAK NASININ ALI TIRILMASI VE KAYNAK LEM OPERATION OF THE MACHINE AND WELDING PROCESS 8 9 KAYNAK POZ SYONLARI WELDING POS...

Page 3: ...motor power t g c Heater power al ma aral Operating range al ma s cakl ortam Operating ambient temparature Gerekli jenerat r g c Generator power Standart makine a rl Machine weight Sand kl makina a r...

Page 4: ...lmi tir 10 C 40 C ortam s cakl nda al t r lmaya uygundur CNC W400 HYDRAULIC BUTT WELDING MACHINE GENERAL FEATURES Machine is for weldings of PE PP PVDF pipes and fittings up to 32 Bar Welding sizes ar...

Page 5: ...W400 MONOPHASE EQUIPMENTS OF THE HYDRAULIC MACHINE CNC W400 2 3 4 5 1 ANA G VDE 2 CNC H DROL K N TE 3 ISITICI MAIN BODY CNC HYDRAULIC UNIT HEATER 4 TRA LAYICI 5 MUHAFAZA VE DESTEK KUTUSU 6 TRIMMER PRO...

Page 6: ...AIN BODY The main body supports and centres the plastic pipes with two fixed and two movable clamps Using the hydraulic pressure on the system the two pistons on the carrying metal bars move the clamp...

Page 7: ...yla s tarak birle tirme lemine haz rlayan al n kaynak makinesi eleman d r Is t c n n s derece ayar hidrolik nite zerinde bulunan dijital s ayar termostat ile yap lmaktad r TRIMMER The trimmer is the...

Page 8: ...e kar darbe su vb korur 1 ISITICI HAZNES 2 TRA LAYICI HAZNES 3 TUTMA KOLU HEATER CHAMBER TRIMMER CHAMBER HANDLE PROTECTIVE CASE The protective casing prevents heat loss of the heater and protects the...

Page 9: ...UNIT CNC Elektrik ve hidrolik kontrol nitesi makinenin al mas i in gerekli olan elektri i s t c ve tra lay c ya hidrolik bas nc ise ana makineye iletir Kontrol nitesi el kumandas vas tas ile al t r l...

Page 10: ...8 220 V TRA LAMA BASINCI...

Page 11: ...9 CNC W400 400...

Page 12: ...10...

Page 13: ...11 CNC W400 CNC W400 K SERI...

Page 14: ...12...

Page 15: ...13...

Page 16: ...14...

Page 17: ...15 400 CNC W400 TRIMMER PRESSURE...

Page 18: ...16...

Page 19: ...17 CNC W400 CNC W400...

Page 20: ...18 CNC W400 CNC W400...

Page 21: ...Installation of straight pipe and an elbow D z boru ve flan adapt r ba lant ekli Flan adapt r n makinaya ba lamak i in flan aparat na ihtiya vard r ekil 1 Installation of straight pipe and stub end fl...

Page 22: ...ekil 1 Flan adapt r paftas n n kullan lmas Fig 1 Using the flange adaptor clamp 1 20...

Page 23: ...an nce tra lay c n n emniyet pimi kapat lmal d r Tra lay c al r durumdayken kesinlikle ta nmamal d r Tra lama i lemi bittikten sonra tra lay c n n elektrik fi i panodan kar l p muhafaza kutusuna bu ek...

Page 24: ...FAZLA BASIN TAN KAYNAKLANAN HATA ERROR DUE TO OVER PRESSURE YETERS Z SICAKLIKTAN KAYNAKLANAN HATA ERROR DUE TO INSUFFICIENT HEAT BORULARDA KAYNAK HATALARI WELDING DEFECTS YETERS Z BASIN TAN KAYNAKLAN...

Page 25: ...necessary for the required bead thickness Heating time with loose pressure Time necessary for change over the heater Time of increasing the pressure Time necessary for cooling Pressure necessary for...

Page 26: ...7 7 8 1 5 77 6 6 11 12 355 8 7 10 1 5 87 7 7 12 14 400 9 8 13 1 5 98 7 7 13 15 24 PN 4 SDR41 PE100 Boru ap OD Boru et kal nl s Kuvvet Bas n Dudak y ksekl mm Bas n s z s tma s res t2 Is t c kartma s r...

Page 27: ...5 119 8 8 16 19 280 13 4 11 2 134 8 9 18 20 315 15 15 2 150 9 9 19 22 355 16 9 19 2 169 9 10 22 25 400 19 1 24 2 5 191 10 11 24 28 25 PN 6 3 SDR26 PE100 Boru ap OD Boru et kal nl s Kuvvet Bas n Dudak...

Page 28: ...1 23 27 280 20 6 18 2 5 206 11 12 26 29 315 23 2 23 2 5 232 11 13 29 33 355 26 1 29 3 261 12 14 32 37 400 29 4 36 3 294 13 15 36 42 26 PE 100 PE 100 PN 10 SDR17 PE100 Boru ap OD Boru et kal nl s Kuvve...

Page 29: ...sec sec min min 160 14 6 7 2 146 8 9 19 22 180 16 4 9 2 164 9 10 21 25 200 18 2 11 2 182 10 11 23 27 225 20 5 14 2 5 205 11 12 26 29 250 22 7 17 2 5 227 11 13 28 33 280 25 4 22 2 5 254 12 14 31 36 31...

Page 30: ...5 29 3 5 415 17 21 50 58 280 46 5 36 3 5 465 19 23 56 62 315 52 3 46 4 523 21 26 62 66 355 59 0 58 4 590 22 29 69 80 400 66 7 74 4 667 24 33 77 88 28 PN32 SDR6 PE100 Total Cyl nder Sect on 14 14 cm A...

Page 31: ...1 5 85 7 7 12 14 315 9 7 10 1 5 97 7 7 13 15 355 10 9 12 1 5 109 8 8 15 17 400 12 3 16 2 123 8 8 16 19 29 PE 80 PN 3 2 SDR41 PE80 Boru ap OD Boru et kal nl s Kuvvet Bas n Dudak y ksekl mm Bas n s z s...

Page 32: ...8 16 19 280 13 4 12 2 134 8 9 18 21 315 15 15 2 150 9 9 19 22 355 16 9 19 2 169 9 10 22 25 400 19 1 24 2 5 191 10 11 24 28 30 PE 80 PN 5 SDR26 PE80 Boru ap OD Boru et kal nl s Kuvvet Bas n Dudak y kse...

Page 33: ...10 11 23 27 280 20 6 18 2 5 206 11 12 26 30 315 23 2 23 2 5 232 11 13 29 33 355 26 1 29 3 261 12 14 32 37 400 29 4 36 3 294 13 15 36 42 31 PE 80 PN 8 SDR17 PE80 Boru ap OD Boru et kal nl s Kuvvet Bas...

Page 34: ...utma s res t5 Toplam s re P pe d ameter OD Wall th ckness s Force Pressure Bead he ght Heat Up t me w thout pressure t2 Change Over t me t3 Pressure ncreas ng t me t4 Cool ng Up t me t5 Total Weld ng...

Page 35: ...s t5 Toplam s re P pe d ameter OD Wall th ckness s Force Pressure Bead he ght Heat Up t me w thout pressure t2 Change Over t me t3 Pressure ncreas ng t me t4 Cool ng Up t me t5 Total Weld ng T me OD s...

Page 36: ...Toplam s re P pe d ameter OD Wall th ckness s Force Pressure Bead he ght Heat Up t me w thout pressure t2 Change Over t me t3 Pressure ncreas ng t me t4 Cool ng Up t me t5 Total Weld ng T me OD s P1 P...

Page 37: ...res t5 Toplam s re P pe d ameter OD Wall th ckness s Force Pressure Bead he ght Heat Up t me w thout pressure t2 Change Over t me t3 Pressure ncreas ng t me t4 Cool ng Up t me t5 Total Weld ng T me OD...

Page 38: ...4 8 11 1 5 367 10 20 35 42 280 38 3 14 1 5 394 10 22 39 47 315 42 5 25 2 517 15 37 61 70 355 47 9 32 2 548 17 42 68 75 400 54 41 2 547 18 45 74 80 36 PP Boru ap OD Boru et kal nl s Kuvvet Bas n Dudak...

Page 39: ...24 2 5 541 16 40 66 75 315 52 5 31 2 5 574 18 45 73 84 355 59 1 39 2 5 613 19 51 80 92 400 66 6 49 2 5 656 21 57 89 101 mm mm bar mm sec sec sec min min 160 32 1 9 2 446 13 27 48 41 180 36 1 12 2 477...

Page 40: ......

Page 41: ...K NEYE VERECE ZARAR GARANT KAPSAMINA DAH L ED LMEYECEKT R 2 HERHANG B R F Z KSEL DARBE SONUCU OLU AN MEKAN K ZARARLAR GARANT KAPSAMINA DAH L DE LD R 3 MAK NE KULLANIM KILAVUZUNA UYGUN EK LDE ALI TIRIL...

Page 42: ...SOURCES WILL NOT BE COVERED BY THIS CERTIFICATE 2 ANY MECHANICAL DAMAGES THAT OCCURED BY PHYSICAL IMPACTS WILL NOT BE COVERED BY THIS CERTIFICATE 3 PLEASE OPERATE THE MACHINE ACCORDING TO USER MANUAL...

Page 43: ...r com tr Elbor Makine San ve Tic Ltd ti Merkez Mahallesi Selimpasa Ortakoy Sanayi Bolgesi 608 Caddesi 732 Sokak Selim Pa a Cd No 97 stanbul T RK YE Tel 90 212 549 43 57 Fax 90 212 549 43 58 info elbor...

Page 44: ...koy Sanayi Bolgesi 608 Caddesi 732 Sokak Selim Pa a Cd No 97 stanbul T RK YE Tel 90 212 549 43 57 Fax 90 212 549 43 58 info elbor com tr export elbor com tr export weltech com tr elbormak ne elbormak...

Reviews: