Assembly / commissioning
06/2021
1026902-00
Operating instructions – 21/52
The assembly is the same process in reverse order.
–
Replace and close the cover.
–
Tighten the screw.
2.3
Commissioning
WARNING!
Damage to device possible!
Where there are great differences in temperature between
the transport route and the installation site the device may
not be put into operation immediately after being set up.
–
Wait at least 2 hours before connecting the device to
the power supply.
–
Run the cable with the SPA connectors through the opening provided for
this purpose in the frame.
–
Run the cable along the profile and then through the well.
See assembly instructions, section 5.2 “Cladding and assembly” for disas-
sembly of the cladding and mid-station cover.
–
Insert connectors in the mid-station:
ST2
X505
RJ45
Summary of Contents for SPA COMPLETE
Page 2: ......
Page 24: ...Assembly commissioning 22 52 Insert connectors in the control box ST9...
Page 55: ......