background image

Power Requirements

•  230VAC, 1~, 16A minimum, 32A optimum, 50Hz
•  3 wires (line, neutral, ground)

System Outputs

Basic System Features and Functions

Basic System Features and Functions

Setup 1 (As Manufactured)

• 230V Pump 1, 2-Speed
• 230V Ozone
• 10V Spa Light
• 230V 3.0kW Heater

PN 58202

Summary of Contents for TRIGLAV

Page 1: ...USER MANUAL TRIGLAV SPA SYSTEM www wellis eu Version 01 2014 1x3HP Hydromassage pumps New GS100 VL260 control system 28 jets Chromotherapy lamp with 55 LEDs UV C water sanitizer WPC frame...

Page 2: ...imum Total number of jets 28 pc Hydromassage pump 1x 3 HP 230V 50Hz Hot air blower pump Energy efficient LAING circulation pump Diverter 1pc Chromotherapy lighting 1 lamp with 55 LEDs Exclusive colour...

Page 3: ...rranted against cracking blistering or delaminat ing due to defects in materials or workmanship for three years from the original date of delivery 2 years on spa plumbing Spa fittings and plumbing are...

Page 4: ...for one year from the original date of delivery 2 year on ISIS Genesis disinfection system The factory installed ISIS Genesis disinfection systems are warranted against failure due to defects in mater...

Page 5: ...liability or any other legal theory related to this product All consequential expenses including loss of use damages or contingent liabilities arising out of any alleged deficiencies of the spa are sp...

Page 6: ...ns misuses abuses or if any repairs are attempted by anyone other than its authorised dealers 6 If damage to the spa has resulted from improper use of thermo cover 7 If damage to the spa has resulted...

Page 7: ...orsz g Kft be liable for costs associated with but not limited to building alterations or finishes and under no circumstances will be liable for greater expense than the amount paid for the product TH...

Page 8: ...iled component _____________________________ New deadline for the warranty _____________________________ The announcement date of damage _____________________________ Date of received goods parts for...

Page 9: ......

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ...away form rain snow if possible build a gazebo for your spa 1 Don t attempt to open the electrical control box There are no user serviceable parts inside 2 Drain clean and refill your spa with fresh w...

Page 14: ...water Microorganisms are small microscopic organisms which cannot be detected with the naked eye and are continuously getting into the water through rain wind and the body of the bathers If they are...

Page 15: ...TROUBLESHOOTING...

Page 16: ......

Page 17: ...ruction Manual for complete instructions on Power up and Pump Priming The Priming mode will last for less than 5 minutes press Temp or Set to skip Priming Mode and then the spa will begin to heat the...

Page 18: ...il next power up After the pump has been running for 2 minutes the temperature will be displayed DO NOT ENTER THE WATER Remove the spa cover and allow water to cool Once the heater has cooled reset by...

Page 19: ...trols shall be located not less than 1 5 meters horizontally from the spa or hot tub Warning GFCI or RCD Protection The Owner should test and reset the GFCI or RCD on a regular basis to verify its fun...

Page 20: ...of the inspection pit The inspection pit has to be aired accordingly proposal building in an extractor fan The inspection pit s minimum width is 60 cm around the spa If the spa is placed indoor please...

Page 21: ...Group System PN 56300 System Model MP7 GS100 DCA 3 0K Software Version 41 EPN 3825 Base PCBA PN 56301 PCB VS100C PN 24084 Rev A Base Panels VL200 Mini PN 55123 VL240 MVP240 PN 55080 VL260 MVP260 PN 55...

Page 22: ...nimum 32A optimum 50Hz 3 wires line neutral ground System Outputs Basic System Features and Functions Basic System Features and Functions Setup 1 As Manufactured 230V Pump 1 2 Speed 230V Ozone 10V Spa...

Page 23: ...that is a VS511SZ at version 38 Displayed next is indicating the system is configured for a heater between 3 and 6 kW or indicating the system is configured for a heater effectively between 1 and 3 k...

Page 24: ...S NORMALLY OFF ALL UNUSED SWITCHES SHOULD BE OFF TEST MODE OFF UNUSED P1 TEMP LIGHT DUPLEX PANEL N A MUST BE OFF SEE PUMP TABLE 60HZ OPERATION STD ECON SLEEP ALLOWED DEGREES FAHRENHEIT SEE PUMP TABLE...

Page 25: ...OFF A2 ON position Button layout will be Pump 1 Light Temp Down Temp Up OFF position Button layout will be Unused Pump 1 Temp Light A3 ON position use Mini Panel OFF position use Lite Duplex or Digit...

Page 26: ...nector Voltage The VS100 circuit board is factory configured to deliver a preset voltage of 120V to the on board ozone connector J29 Balboa Ozone Generator The board is set up to operate a 120V ozone...

Page 27: ...erlay PN 11746 Connects to Main Panel terminal J1 DIP switch A3 must be OFF DIP switch A3 must be ON VL401 Lite Digital PN 54665 with Overlay PN 11885 Connects to Main Panel terminal J1 Jets Light War...

Reviews: