4.
Connect the connecting cable for the water-treatment filter monitor to
the combi oven in accordance with the PIN assignment shown below.
PIN
Assignment
1
Signal
2
GND
5.
Refit the side panel on the combi oven.
6.
Put the combi oven and water-treatment filter monitor into operation.
6 Installation
Installation manual
48
Summary of Contents for C4 EB 12.20
Page 2: ......
Page 5: ...10 9 Convotherm 4 20 20 injection gas appliance 117 Table of Contents Installation manual 5 ...
Page 119: ......