![Welbilt C4 EB 12.20 Installation Manual Download Page 37](http://html.mh-extra.com/html/welbilt/c4-eb-12-20/c4-eb-12-20_installation-manual_953843037.webp)
Taking the appliance off the pallet (marine version)
1.
Remove the screws from the flanged feet of the appliance that hold the
combi oven on the pallet.
2.
Use a forklift truck or pallet truck to pick up the appliance.
■
To protect the wheel-in rail (1) for the loading trolley, insert two
lengths of wood underneath the appliance according to the type of
lifting gear you are using and the side from which you are lifting the
appliance.
3.
Move the appliance carefully off the pallet to the installation location.
4.
Remove the protective plastic from the combi oven.
5 Setting up the appliance
Installation manual
37
Summary of Contents for C4 EB 12.20
Page 2: ......
Page 5: ...10 9 Convotherm 4 20 20 injection gas appliance 117 Table of Contents Installation manual 5 ...
Page 119: ......