5.2 Hydraulic connection
▶
Flush the heating system with at least twice the total system content.
✓
Contaminants are removed.
▶
Connect the supply and the return (Recommendation: Use shut off valves).
▶
Fit safety valves.
▶
Fit expansion vessel.
▶
If necessary, install a sludge trap in the return line.
1
Safety valve connection G1"
2
Supply 1½" (union nut)
3
Return 1½" (union nut)
4
Connection expansion vessel Ø 22 mm
5
fill and return tap
Filling the water
CAUTION
Damage to the condensing boiler due to unsuitable fill water
Corrosion and scale could damage the system.
▶
Adhere to the requirements for the heating water and the local directives
▶
Open the shut off valves.
▶
Gradually fill the heating system through the inlet tap (system pressure minimum
1.3 bar).
▶
Vent the system.
▶
Check the system for leakage and check the filling pressure.