Installation and operating instructions
Fresh water station WHI freshaqua 22
5 Installation
83514302 ▪ 1/2017-08 ▪ Ext. PAW
19-32
5.2
Connection
Pipe the fresh water module with the system according to the diagram below.
Pipe gap from the wall
(secondary) = 107 mm
1
Secondary side:
hot water outlet
connection ¾" male thread, flat sealing
2
Primary side:
supply from buffer tank,
¾" female thread,
piping
minimum DN 20, 22 x 1 mm,
recommended DN 25, 28 x 1.5 mm
3
Primary side:
return to buffer tank,
¾" female thread,
piping
minimum DN 20, 22 x 1 mm,
recommended DN 25, 28 x 1.5 mm
4
Secondary side:
cold water inlet
connection ¾" male thread, flat sealing
Pipe gap from the wall
(primary) = 67 mm
5.3
Controller connection
WARNING
Risk to life and limb due to electric shock!
Prior to performing electrical work on the controller,
de-energise the system.
For more information, see enclosed installation and
operation instructions of the station controller.
Connect the fresh water station to the power supply
system (230 V, 50 Hz) only after completing all
installation work, filling and flushing.
This avoids an unintentional start of the motors.
The plug-in pump lines are permanently supplied with a
mains voltage of 230 V and cannot be switched off via
the controller.
The fresh water station is pre-wired in the factory. When using the circulation pump,
its connection can be obtained from the enclosed assembly instructions.