Installation and operating instruction
Dual fuel burner WGL30/1-C ZM
3 Product description
83260202 1/2019-02 La
19-144
Oil operation
B4
P11
W-FM 25
P
P
B15
L
T1 T2
F2
N
L N
K11
1
K14
3N
K15
1
K13
6
M
M20
M
1
M1
3N
M
1
M2
3N
T
I
T
V
T
N
T1
4
T
S
P
B16
T6
T8
T7
B1
13
FLW
L/A
B36
P
12
1234
5
B1
Flame sensor
1
Operating point P
0
(ignition position)
B15
Temperature or pressure regulator
2
Operating point P
1
(stage 1)
B16
Temperature or pressure regulator stage 2
3
Operating point P
2
(solenoid valve stage 2)
B36
Minimum oil pressure switch
4
Operating point P
9
(stage 2)
F2
Temperature or pressure limiter
5
Operating phase
K11
Stage 1 oil solenoid valve
T
I
Initialisation time (Test): 3 s
K13
Stage 2 oil solenoid valve
T
N
Post-purge time: 2 s [ch. 6.2.3]
K14
Oil safety solenoid valve on the oil pump
T
S
Safety time: 3 s
K15
Oil safety solenoid valve
T
V
Pre-purge time: 20 s
M1
Burner motor
Voltage is applied
M2
Pump motor
Flame signal present
M20
Air damper actuator
Current path
P11
Control lamp operation (optional)
T1
Ignition unit