![Weir Esco ULTRAEDGE Maintenance Manual Download Page 7](http://html.mh-extra.com/html/weir/esco-ultraedge/esco-ultraedge_maintenance-manual_953268007.webp)
7
1.7 Tighten Bolt
1. Tighten bolts to 1,000 ft/lb.
See
Figure 1.7.1.
2. Check to ensure that the shroud is in solid contact
with the front of the lip. See
Figure 1.7.2.
3. Repeat tightening process for the remaining bolts
in each shroud. Tighten in the order shown.
See
Figure 1.7.3.
Tip:
Using a brass or copper hammer jolt each bolt
head 3 times to help settle the shroud and fasteners
then retighten to 1,000 ft/lbs. See
Figure 1.7.4
Figure 1.7.1 – Bolt Tightening
Figure 1.7.2 – Shroud and lip contact
Contact
Figure 1.7.3 – Bolts Tightening Patterns
3
4
4
3
1
2
2
1
2
1
1
2
3
3
4
Figure 1.7.4 – Settling shroud