![Weir Esco ULTRAEDGE Maintenance Manual Download Page 5](http://html.mh-extra.com/html/weir/esco-ultraedge/esco-ultraedge_maintenance-manual_953268005.webp)
5
1.3 Pre-position Nut to About 45°
1. If the optimal rotation of the nuts is known from a previous shroud installation then rotate the nuts to that
orientation; If not, leave the nuts rotated about 45°. See
Figure 1.3.1.
WARNING:
When inspecting shroud, ensure that the shroud is positioned against motion.
Figure 1.3.1 – Nuts Angled at 45°
1.4 Position Shroud on Lip
1. Shroud must have full contact on leading edge. See
Figure 1.4.1.
2. Shroud must have contact along bottom surface. See
Figure 1.4.1.
Contact
Figure 1.4.1 – Shroud Placement on Lip